My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1. Install bridging immediately after joist erection and before loads are applied <br />to the joists. <br /> <br />K. Carefully do the bridging of exposed joists with members in alignment, carefully <br />cut and fitted, and welding neatly done. <br /> <br />L. Provide galvanized bolts for exterior work-plain steel for interior work. <br /> <br />M. Perform field installation in strict accordance with the manufacturer’s <br />recommendations. <br /> <br />N. Remove weld spatter and burrs by chipping and grinding from field welding <br />accomplished on surfaces down to a point two feet below the top of the plant. <br /> <br />O. Field painting of the plant and accessories mounted on or attached to the <br />exterior of the tank shall include masking of galvanized and aluminum surfaces. <br /> <br />3.03 PROTECTION <br /> <br />A. Protect structural steel items from weather properly stored off the floor and <br />grade in a manner satisfactory to the ENGINEER. <br /> <br />B. Protect structural steel items from corrosion. <br /> <br />3.04 PAINTING <br /> <br />A. Remove rust, mill scale, and weld slag from steel surfaces using commercial <br />blast in accordance with SSPC-SP-6-63. <br /> <br />1. Remove weld splatter and surface roughness by chipping and grinding <br />smooth. <br /> <br />2. Perform blasting indoors to produce a mil profile for optimum adhesion of the <br />primer. <br /> <br />3. Sand blasting shall be accepted. <br /> <br />B. Prepared surfaces shall be thoroughly dry and free from preparation dust and <br />foreign matter prior to the application of coating. <br /> <br />1. Craftsmen applying protective coatings shall be thoroughly familiar with the <br />application guidelines and preparation requirements of the product to be <br />applied. <br /> <br />2. Evenly apply coating materials and shall be free from obvious defects. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />05120 - 5 Structural Steel <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.