My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.06 HDPE INSTALLATION AND FUSION TESTING <br /> <br />A. The Manufacturer shall supply an Installation Manual to the ENGINEER which <br />outlines and guideline for handling, joining, installation, embedding and testing <br />of polyethylene pipeline. <br /> <br />1. These guidelines shall be used as reference material for the ENGINEER in <br />the determination of the required procedures. <br /> <br />B. Joints between plain ends of polyethylene pipe shall be made by butt fusion <br />when possible. <br /> <br />1. The Pipe Manufacturer’s fusion process shall be followed at all times as well <br />as the recommendations of the Fusion Machine Manufacturer. <br /> <br />2. The wall thickness of the adjoining pipes shall have the same DR at the <br />point of fusion. <br /> <br />C. When saddle connections are fusion welded, the Manufacturer’s recommended <br />saddle fusion procedure shall be used. <br /> <br />D. If mechanical fittings (which are designed for, or tested and found acceptable for <br />use with polyethylene pipe) are utilized for transitions between pipe materials, <br />repairs, joining pipe sections, saddle connections, or at other locations; the <br />recommendation of the Mechanical Fitting Manufacturer must be followed. <br /> <br />1. These procedures may differ from other pipe materials. <br /> <br />E. On each day butt fusion’s are to be made, the first fusion of the day shall be a <br />trial fusion. <br /> <br />1. The trail fusion shall be allowed to cool completely, and then fusion test <br />straps shall be cut out. <br /> <br />2. The test strap shall be 12” or 30 times the wall thickness in length (minimum) <br />and 1” or 1.5 times the wall thickness in width (minimum). Bend the test <br />strap until the ends of the strap touch. <br /> <br />3. If the fusion fails at the joint, a new trial fusion shall be made, cooled <br />completely and tested. <br /> <br />4. Butt fusion of pipe to be installed shall not commence until a trail fusion has <br />passed the bent strap test. <br /> <br />F. Socket and Saddle fusions shall be tested by a bent strap, as described by the <br />Pipe Manufacturer. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />15105 - 20 Pipes and Tubes <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.