My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />checked by and stamped with the approval of the CONTRACTOR and identified <br />as the ENGINEER may require. The data shown on the Shop Drawings will be <br />complete with respect to dimensions, design criteria, materials of construction and <br />the like to enable the ENGINEER to review the information as required. <br /> <br />Samples Required by Contractor: <br /> <br /> 6.24 The CONTRACTOR will also submit to the ENGINEER for review, with such <br />promptness as to cause no delay in Work, all samples required by the Contract <br />Documents. <br /> <br /> All samples will have been checked by and stamped with the approval of the <br />CONTRACTOR, identified clearly as to material, manufacturer, any pertinent <br />catalog numbers and the use for which intended. <br /> <br />Deviations in Shop Drawings: <br /> <br /> 6.25 At the time of each submission, the CONTRACTOR will in writing call the <br />ENGINEER'S attention to any deviations that the Shop Drawings or sample may <br />have from the requirements of the Contract Documents. <br /> <br />Review of Shop Drawings: <br /> <br /> 6.26 The ENGINEER will review with responsible promptness Shop Drawings and <br />samples, but his review shall be only for conformance with the design concept of <br />the Project and for compliance with the information given in the Contract <br />Documents. The review of a separate item as such will not indicate review of the <br />assembly in which the item functions. The CONTRACTOR will make any <br />corrections required by the ENGINEER and will return the required number of <br />corrected copies of Shop Drawings and resubmit new samples until the review is <br />satisfactory to the ENGINEER. The CONTRACTOR shall direct specific attention <br />in writing or on resubmitted Shop drawings to revisions other than the corrections <br />called for by the ENGINEER on previous submissions. The CONTRACTOR'S <br />stamp of approval on any Shop Drawing or sample shall constitute representation <br />to the OWNER and the ENGINEER that the CONTRACTOR has either <br />determined and verified all quantities, dimensions, field construction criteria, <br />materials, catalog numbers and similar data or he assumes full responsibility for <br />doing so, and that he has reviewed or coordinated each Shop Drawing or sample <br />with the requirements of the Work and the Contract Documents. <br /> <br />Commencing Work: <br /> <br /> 6.27 No work requiring a Shop Drawing or sample submission shall be <br />commenced until the submission has been reviewed by the ENGINEER. A copy <br />of each Shop Drawing and each approved sample shall be kept in good order by <br />the CONTRACTOR at the site and shall be available to the ENGINEER. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />17 <br />General Conditions <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.