My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Work or change in the Contract Price and the amount of the applicable bonds shall <br />be adjusted accordingly. The CONTRACTOR will furnish proof of such an <br />adjustment to the OWNER. <br /> <br />ARTICLE 11 - CHANGE OF CONTRACT PRICE <br /> <br /> 11.1 The Contract Price constitutes the total compensation payable to the <br />CONTRACTOR for performing the work. All duties, responsibilities and obligations <br />assigned to or undertaken by the CONTRACTOR shall be at his expense without <br />changing the Contract Price. <br /> <br /> 11.2 (a) The OWNER may, at any time, without written notice to the sureties, by <br />written order designated or indicated to be a change order, make any change in <br />the Work within the general scope of the Contract, including but not limited to <br />changes: <br /> <br />(1) in the specifications (including drawings and designs); <br /> <br />(2) in the method or manner of performance of the work. <br /> <br />(3) in the OWNER-furnished facilities, equipment, materials, <br />services, or site; or <br /> <br />(4) directing acceleration in the performance of the work. <br /> <br /> (b) Any other written order or an oral order (which terms as used in this <br />paragraph (b) shall include direction, instruction, interpretation or <br />determination) from the OWNER, which causes any such change, shall be <br />treated as a change order under this clause, provided that the <br />CONTRACTOR gives the OWNER written notice stating the date, <br />circumstances, and source of the order and that the CONTRACTOR <br />regards the order as a change order. <br /> <br /> (c) Except as herein provided, no order, statement, or conduct of the <br />OWNER shall be treated as a change under this clause or entitle the <br />CONTRACTOR to an equitable adjustment hereunder. <br /> <br /> (d) If any change order under this clause causes an increase or decrease in <br />the CONTRACTOR'S cost of, or the time required for, the performance of <br />any part of the work, under this contract, whether or not changed by any <br />order, an equitable adjustment shall be made and the contract modified in <br />writing accordingly: Provided, however, that except for claims based on <br />defective specifications, no claim for any change order under (b) above <br />shall be allowed for any costs incurred more than 20 days before the <br />CONTRACTOR gives written notice as therein required: and provided <br />further, that in the case of defective specifications for which the OWNER is <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />28 <br />General Conditions <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.