My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> 12.4 The CONTRACT TIME may only be changed by a Change Order. Any claim <br />for an extension in the CONTRACT TIME shall be based on written notice <br />delivered to the OWNER and ENGINEER within ten days of the occurrence of the <br />event giving rise to the claim. <br /> <br /> Notice of the extent of the claim with supporting data shall be delivered within forty- <br />five days of such occurrence unless ENGINEER allows an additional period of <br />time to ascertain more accurate data. All claims for adjustment in the CONTRACT <br />TIME shall be determined by ENGINEER if OWNER and CONTRACTOR cannot <br />otherwise agree. Any change in the CONTRACT TIME resulting from any such <br />claim shall be incorporated in a Change Order. <br /> <br /> 12.5 The Contract Time will be extended in an amount equal to time lost due to <br />delays beyond the control of CONTRACTOR if he makes a claim therefore as <br />provided in paragraph 12.4 Such delays shall include, but not be restricted to, acts <br />or neglect by any separate contractor employed by OWNER, fires, floods, labor <br />disputes, epidemics, abnormal weather conditions, or acts of God. <br /> <br /> 12.6 All time limits stated in the Contract Documents are of The essence of the <br />Agreement. The provisions of this Article 12 shall not exclude recovery for <br />damages (including compensation for additional professional services) for delay by <br />either party. <br /> <br /> 12.7 No claim for delay shall be allowed because of failure to furnish Drawings <br />until two weeks after demand for such Drawings and not then unless such claim be <br />reasonable. <br /> <br /> 12.8 This article does not exclude the recovery of damages for delay by either <br />party under other provisions in the Contract Documents. <br /> <br /> 12.9 No claim for extension of time will be considered because of unusual <br />weather conditions, and no reparation shall be made to the CONTRACTOR for <br />damages to the Work resulting therefrom, except as stipulated in paragraph 15.2 <br />and as follows. The ENGINEER shall be responsible for determining the extent of <br />extension of time, and shall notify the OWNER and CONTRACTOR in writing <br />thereof within seven days after CONTRACTOR has been notified to resume work. <br /> Such extension shall be covered by a Change Order adjusting the Contract Time. <br /> <br />ARTICLE 13 - GUARANTEE <br /> <br /> 13.1 The CONTRACTOR shall guarantee all materials and equipment furnished <br />and Work performed for a period of one (1) year from the date of SUBSTANTIAL <br />COMPLETION. The CONTRACTOR warrants and guarantees for a period of one <br />(1) year from the date of SUBSTANTIAL COMPLETION of the system that the <br />completed system is free from all defects due to faulty materials or workmanship <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />34 <br />General Conditions <br />14-1758 / 09-19-2014 <br />