<br />Work During Inclement Weather: <br /> <br /> 15.2 No work shall be done under these specifications except by permission of <br />the ENGINEER when the weather is unfit for good and careful work to be <br />performed. Should the severity of the weather continue, the CONTRACTOR, <br />upon the direction of the ENGINEER, shall suspend all work until instructed to <br />resume operations by the ENGINEER and the Contract Time shall be extended to <br />cover the duration of the order. Work damaged during periods of suspension due <br />to inclement weather shall be repaired and/or replaced by the CONTRACTOR. <br />Any compensation for repairs or replacements shall be subject to approval of the <br />OWNER. <br /> <br />OWNER May Terminate: <br /> <br /> 15.3 If the CONTRACTOR is adjudged bankrupt or insolvent, or if he makes a <br />general assignment for the benefit of his creditors, or if a trustee or receiver is <br />appointed for the CONTRACTOR or for any of his property, or if he files a petition <br />to take advantage of any debtor's act, or to reorganize under the bankruptcy or <br />similar laws, or if he repeatedly fails to supply sufficient skilled workmen or suitable <br />materials or equipment, or if he repeatedly fails to make prompt payments to <br />Subcontractors or for labor, materials or equipment or he disregards laws, <br />ordinances, rules, regulations or orders of any public body having jurisdiction, or if <br />he disregards the authority of the ENGINEER, or if he otherwise violates any <br />provision of, the Contract Documents, then the OWNER may, without prejudice to <br />any other right or remedy and after giving the CONTRACTOR and his surety <br />seven days' written notice, terminate the services of the CONTRACTOR and take <br />possession of the Project and of all materials, equipment, tools, construction <br />equipment and machinery thereon owned by the CONTRACTOR, and finish the <br />Work by whatever method he may deem expedient. In such case the <br />CONTRACTOR shall not be entitled to receive any further payment until the Work <br />is finished. If the unpaid balance of the Contract Price exceeds the direct and <br />indirect costs of completing the Project, including compensation for additional <br />professional services, such excess shall be paid to the CONTRACTOR. If such <br />costs exceed such unpaid balance, the CONTRACTOR will pay the difference to <br />the OWNER. Such costs incurred by the OWNER will be determined by the <br />ENGINEER and incorporated in a Change Order. <br /> <br />Contractor Termination: <br /> <br /> 15.4 Where the CONTRACTOR'S services have been so terminated by the <br />OWNER, said terminations shall not affect any rights of the OWNER against the <br />CONTRACTOR then existing or which may thereafter accrue. Any retention or <br />payment of moneys by the OWNER due the CONTRACTOR will not release the <br />CONTRACTOR from liability. <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />40 <br />General Conditions <br />14-1758 / 09-19-2014 <br />