Laserfiche WebLink
<br />A. Photograph from locations to adequately illustrate condition of construction and <br />state of progress. <br /> <br />1. At successive periods of photography, take at least one photograph from the <br />same overall view as previously. <br /> <br />2. Consult with the ENGINEER at each period of photography for instructions <br />concerning views required. <br /> <br />3.03 DELIVERY OF PRINTS <br /> <br />A. Deliver two (2) sets of prints to the OWNER to accompany each Application for <br />payment with digital files. <br /> <br />3.04 RECORDED INFORMATION - AUDIO <br /> <br />A. The audio track shall consist of an original live recording of the narrative <br />commentary of the person video taping the work sites. <br /> <br />1. The tape shall begin with the current date, project name, and municipality <br />and each section of the tape will have the general location, i.e. Construction <br />Work Section, name of street, house address, viewing side, and direction of <br />progress for each individual work site. <br /> <br />3.05 RECORDED INFORMATION - VIDEO <br /> <br />A. The video track shall consist of taping the pre-construction surface conditions of <br />each individual work site for the Piping System Improvements. <br />1. The video taping shall show the full extents of the surface conditions from <br />close-up and in the distance, both directly along the route of the work and the <br />conditions to the sides of the work zones (i.e.; curbs, sidewalks, ditches and <br />culverts, utility features, fences, bushes, trees and other landscaped features in <br />and near yards, structures which could be impacted by the work). <br /> <br />2. The person video taping the site conditions shall use good photographic <br />procedures and practices, such as steady handling of the video recorder, <br />taping with their back to the position of the sun, refraining from taping in poor <br />lighting, rain or other adverse weather conditions or moving the video <br />camera too quickly. <br /> <br />3.06 SUBMITTAL OF DVD <br /> <br />A. Audio-visual tape recordings of the pre-construction surface conditions of each <br />individual work site shall be submitted to the OWNER and ENGINEER. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01321 - 5 Construction Photographs <br />and Video Recording <br />14-1758 / 09-19-2014 <br />