My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:17:32 PM
Creation date
6/14/2017 4:15:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
|Request for Proposal No. 14‐11‐01 16 <br />CITY OF SUNNY ISLES BEACH <br />NE 174TH STREET ROADWAY IMPROVEMENTS <br />CSIB RFP NO. 14-11-01 <br />CAS PROJECT NO. 14-1758 <br /> <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE <br />A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM <br />AND/OR UNIT PRICES. <br /> <br />ITEM <br />NO DESCRIPTION QUANTITY UNIT <br />UNIT <br />COST TOTAL <br />Include Coordination with Miami-Dade <br />County Transit for all work involving Shelters <br />and routes. <br /> <br />75 Removal/Disposal of Existing Drainage <br />Structure or Top 4 EA <br />76 Removal/Disposal of Existing Storm Pipe 529 LF <br />77 <br />Installation of Traffic Signal Loop (to be <br />coordinated w/MDC-Traffic Engineering <br />w/MDC-Approved Contractor) <br />1 LS <br />78 Relocation of Existing Landscape Light Pole <br />(including electric) 2 EA <br />79 Installation of New Light Pole (including <br />electric) 2 EA <br />80 Core & Install Proposed Pipe to Existing <br />Seawall 1 LS
The URL can be used to link to this page
Your browser does not support the video tag.