Laserfiche WebLink
FINISH GRADE <br />SUMP - 1 CU. FT. <br />REQUIRED <br />GRAVEL SUMP. <br />4" <br />NUT. <br />UNDISTURBED SOIL <br />4" <br />3/4" SCREENED GRAVEL <br />6" CLASS 160 PVC - LENGTH AS <br />CONCRETE THRUST BLOCK - REFER <br />TO TECHNICAL SPECIFICATIONS <br />PVC PRESSURE SUPPLY LINE <br />CAST IRON GATE VALVE <br />MECHANICAL OR GASKETED <br />JOINT W/ SQUARE OPERATING <br />10" ROUND VALVE BOX. BRAND <br />"GV" INTO VALVE BOX LID. REFER <br />TO TECHNICAL SPECIFICATIONS. <br />VALVE BOX TO REST ON <br />SCALE: N.T.S. <br />GATE VALVE 3" AND UP <br />SECTION <br />PLAN <br />SECTION <br />PLAN <br />SECTION <br />PLAN <br />SECTION <br />PLAN <br />SECTION <br />PLAN SPECIFICATIONS. <br />MANUFACTURER'S INSTALLATION <br />WIRING AT 10' INTERVALS <br />TAPE AND BUNDLE <br />ALL PLASTIC PIPING TO BE <br />SNAKED IN TRENCHES AS <br />SHOWN. <br />ALL MAIN SUPPLY LINES TO BE <br />INSTALLED IN ACCORDANCE WITH <br />CODE. <br />ALL 120 VOLT WIRING IN <br />CONDUIT TO BE INSTALLED <br />IN ACCORDANCE WITH LOCAL <br />120 VOLT IN CONDUITPLASTIC LATERAL WIRING IN CONDUIT <br />10' <br />WIRING <br />24 <br />" <br />IN MAIN LINE TRENCH) <br />MAIN LINE <br />(WHERE NO WIRING IS <br />LATERALDETECTABLE TAPE <br />12 <br />" <br />24 <br />" <br />12 <br />" <br />24" <br />AND WIRING <br />36 <br />" <br />12 <br />" <br />18 <br />" <br />8"18" <br />MAIN SUPPLY <br />8"12" <br />MAIN SUPPLY, LATERAL <br />SCALE: N.T.S.SCALE: N.T.S. <br />TYPICAL TRENCHING DETAILS <br />ISOMETRIC <br />22" + POLY PIPE <br />LINE SIZE X 1/2" TEE <br />LATERAL LINE <br />1''X1'' STEEL <br />ANGLE 24'' DEPTH <br />SEE BELOW <br />1/2'' FEM ADAPTER <br />( 2 PLACES ) <br />BARBED ELL <br />1/2'' SCH. 40 RISER <br />SEE ABOVE <br />INSTALL HEAD TO MATCH <br />12'' SPRAY OR ROTOR SPRINKLER <br />PVC SCH. 40 RISER-1/2'' <br />SURROUNDING PLANT <br />MATERIAL. SEE PLANT <br />LIST SPECIFICATIONS. <br />TWO STAINLESS STEEL <br />HOSE CLAMPS <br />PAINTED BLACK <br />12'' MIN. <br />MULCH <br />SPRINKLER NOZZLE <br />SCALE: N.T.S.SCALE: N.T.S. <br />12" POP-UP ON RISER <br />CURB OR CONCRETE <br />SCH. 40 PVC SOLVENT WELD <br />PVC LATERAL PIPING <br />SxSxT FITTING <br />12" SCH. 80 PVC NIPPLE <br />X" <br />NOZZLE 2" ABOVE FINISH GRADE <br />BUBBLER HEAD-INSTALL TOP OF <br />SCALE: N.T.S.SCALE: N.T.S. <br />BUBBLER ON RISER DETAIL <br />OFFSET AS <br />REQUIRED <br />THRUST <br />BLOCK <br />SOIL (TYPICAL) <br />UNDISTURBED <br />BLOCK <br />CONC. <br />THRUST <br />H <br />MA <br />X <br />. <br />H/ <br />2 <br />CROSSCUT <br />EDGE OF <br />18" <br />MIN. <br />AREA <br />(Sq. Ft.) <br />FITTING <br />THRUST <br />PLAN <br />TYPICAL SECTION <br />THRUST BLOCKS ARE TO BE CONSTRUCTED WITH 3,000 PSI CONCRETE AT 48 HRS. STEEL REINFORCING RODS WILL BE REQ'D IF SURROUNDING SOIL HAS A BEARING VALUE OF LESS THAN 2,000 PSF. THRUST BLOCKS REQUIRED AT ALL FITTINGS AND DIRECTION CHANGES ON MAIN LINES. NOTE THRUST BLOCK LOCATIONS ON AS-BUILT DRAWINGS. <br />SCALE: N.T.S.SCALE: N.T.S. <br />TYPICAL THRUST BLOCK DETAIL <br />NOTE: Thrust block areas computed on basis of 2000 lbs. <br />per sq. ft. soil resistance bearing. <br />2.04 <br />1.53 <br />1501.40.5 0.251.0 <br />1501.1.2.4.8 <br />.52 <br />1.52.5 <br />90Ā <br />(Sq. Ft.) <br />BEND <br />PIPE <br />SIZE <br />(inches) <br />150.4.1 <br />1501.1.2 <br />.2.3 <br />.4.8 <br />DESIGN <br />(P.S.I.) <br />PRESSURE <br />TEE OR <br />(Sq. Ft.) <br />PLUG <br />/1 <br />411 Ā <br />(Sq. Ft.) <br />BEND <br />1/222 Ā <br />(Sq. Ft.) <br />BEND <br />45Ā <br />(Sq. Ft.) <br />BEND <br />SCHEDULE FOR THRUST BLOCK AREAS <br />SCALE: N.T.S.SCALE: N.T.S. <br />SCHEDULE OF TYPICAL THRUST BLOCK AREAS <br />Rough blocking forms shall be used along sides of thrust blocks. <br />Install a plastic bearier (Visquine) between fittings and thrust block. <br />All wood blocking shall be pressure treated with preservative. <br />Thrust block bearing areas shall be poured against undisturbed material. Where trench wall has been disturbed, excavate all loose material and extend to undisturbed material. <br />Extend thrust block for full length of fittings. Put board in front of plug before pouring <br />concrete. Joints shall not be covered by thrust block. <br />Thrust blocks shall be used in combination, as required, to suit the specific fitting <br />arrangement. <br />Alternate designed restraining systems shall be provided where standard thrust blocking is not suitable. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />THRUST BLOCK NOTES <br />Number each zone valve box on underside of valve box cover with a black <br />waterproof marker for reference. Numbers shall match the zone numbers on <br />Number each zone valve control wire at the controller with a waterproof marker <br />Maintain the irrigation system until final acceptance of the work. Maintenance <br />shall include work, materials and replacements necessary to insure a complete <br />It will be the Owner's responsibility to maintain the system in working order <br />during the guarantee period, performing necessary minor maintenance, keeping <br />grass from obstructing the sprinkler heads and preventing vandalism and <br />employees or work. <br />CLEANING: The Contractor shall at all times keep the premises (grounds and <br />pavements) free from accumulations of waste material or rubbish caused by his <br />4. <br />2. <br />damage during the landscape maintenance operation. <br />properly operating system. <br />individual settings of control stations. <br />FINAL ADJUSTMENT: Balance and adjust the irrigation system components for <br />efficient, proper operation. This includes controller synchronization as well as <br />LABELS <br />MAINTENANCE <br />INSTRUCTIONS <br />B. <br />1. <br />1. <br />2. <br />A. <br />3. <br />G. <br />and tags. Numbers shall match the zone numbers on the drawings <br />the drawings. <br />grades. <br />MATERIALS: Materials and equipment shall be new and shall operate at the <br />PIPE: Comply with the following unless otherwise indicated: All PVC pipe shall be <br />160 PSI, Polyvinyl Chloride (PVC 1120) ASTM-D2241, Type 1, NSF approved. <br />CROSSINGS: Comply with the following: All crossings under paved areas for water <br />and conduit lines shall be Schedule 40 PVC, ASTM-D1785. All crossings located in F.D.O.T. <br />PIPE FITTINGS: Comply with the following: For PVC plastic pipe, ASTM-D2466 <br />SPRINKLER HEADS: Sprinkler heads shall be of the type shown on the drawings. <br />Filter screens shall be included with all spray heads. <br />Risers and swing joints shall be as detailed on the drawings. <br />REMOTE CONTROL VALVES: Valves shall be as specified on the drawings. Use <br />VALVE BOXES: Valve boxes shall be Ametek VP-10 or approved equal. Install flush <br />CONTROL WIRING: All wiring to automatic circuit valves shall be UF-14 direct <br />burial wire of a different color than the black and white wires used on the 115 volt A.C. <br />PVC Flex connections: Shall be Ag-Products heavy walled flexible PVC pipe or <br />equal. Average length of each connection is referred to on the drawings. Special <br />flex cement shall be utilized for making these connections. <br />Risers for shrub heads shall be Schedule 40 PVC pipe <br />SECTION 2B - IRRIGATION SYSTEM <br />Site work (rough grading). <br />Landscaping (see landscape specifications). <br />Work included: This Section is part of the entire set of contract documents and shall be <br />coordinated with the applicable provisions of the other parts. <br />The extent of landscape irrigation system is shown on the drawings. Completion of <br />this work shall mean full and exact compliance and conformity with the provisions <br />expressed or implied in the drawings, schedules and specifications. Irrigation <br />installer is not relieved of his responsibility to provide proper irrigation coverage by <br />providing full and exact compliance with the drawings and specifications. If field <br />conditions or other unforeseen factors warrant that design modifications are <br />necessary, irrigation installer shall notify Landscape Architect immediately. <br />The work under this section includes furnishing and installing materials to construct <br />an automatic irrigation system and maintaining that system until final completion <br />and acceptance, but not less than 30 days from date of installation, and any other <br />work as called for on the plans and in these specifications. <br />Electrical service to pump and controller shall be provided by others under separate <br />contract with Owner, in compliance with N.E.C. requirements. <br />Landscape irrigation system installation shall only be performed by a firm that is <br />regularly engaged full time in the installation of underground landscape irrigation <br />systems. (Crews shall be controlled and directed by a foreman who is thoroughly <br />familiar with the type of materials being installed and the manufacturer's <br />recommended methods of installation, and is well versed in reading blueprints.) <br />QUALITY ASSURANCE3. <br />A. <br />B. <br />C. <br />RELATED WORK2. <br />A. <br />C. <br />PART 1 - GENERAL <br />DESCRIPTION OF WORK <br />B. <br />1. <br />A. <br />C. <br />Teflon tape only on threaded connections. <br />with finish grade as indicated on drawing. <br />7. <br />8. <br />6. <br />manufacturer's published capacities. <br />socket fittings with ASTM-A2564 solvent cement. <br />RISERS AND SWING JOINTS: <br />A. <br />B. <br />5. <br />3. <br />4. <br />PART 2 - PRODUCTS <br />1. <br />2. <br />GENERAL: The Contractor shall be responsible for full and complete coverage of all <br />irrigated areas and shall make any necessary adjustments at no additional cost to the <br />power. Wiring from the controller to the valves shall be installed in same trench as the <br />mainline where possible. All splices shall be made with Rain Bird snap-tite connectors, <br />or approved equal. All wire shall be furnished in minimum 2,500' reels and spliced <br />CONTROLLER: Controller shall be as specified on the drawings. <br />WATER SOURCE: EXISTING WATER MAIN TO BE UTILIZED. SEE PLANS FOR <br />POINT OF CONNECTION <br />Perform all excavations as required for the installation of the work included <br />under this section, including shoring of earth banks to prevent cave-ins. <br />Restore all surfaces, existing underground installations, etc., damaged or cut as <br />a result of the excavations to their original conditions. <br />Trenches shall be made wide enough to allow a minimum of 2 inches between <br />parallel pipe lines. The minimum vertical clearance between lines crossing at <br />angles greater than 45 degrees is 1 inch. Trenches for pipe lines shall be made <br />of sufficient depth to provide the minimum cover from finish grade as follows: <br />16 in. minimum cover over main lines. <br />16 in. minimum cover over control wires <br />SPRINKLER HEADS: Large gear-driven rotary type shall be installed so that the <br />top is slightly above finish grade. If finish grade has not been established, set the <br />top four inches above grade and lower when finish grade has been achieved. <br />Sprinklers on risers shall be set at elevations so that there is no interruption of the <br />stream from the sprinkler nozzle caused by plant material during the first growing <br />season (1 year from date of installation). Heads along curbs and walks shall be set <br />flush to within 1/8 inch and two to four inches away from curb or walk. Adjust <br />heads having an adjustment stem, for the proper radius and throw for the area <br />CONTROL WIRES: Shall be installed in a neat and orderly fashion underneath the <br />main and lateral pipes, if possible. Ten-inch loops shall be provided at each valve <br />where control wires are connected. All wires passing under existing or future <br />Where possible, install pipe adjacent to curbs or paving to minimize interference <br />with plants and their roots. Coordinate with landscape installer regarding <br />Keep trenches free of obstruction and debris that could tend to damage pipe and <br />control wires. Remove excess soil from the site and leave grade as it was prior <br />to sprinkler system installation. Piping shall be routed around shrubs, trees and <br />Install plastic pipe as recommended by the manufacturer and provide for <br />expansion and contraction. Cut plastic pipe square. Remove burrs at cut ends <br />prior to installation so that a smooth unobstructed flow will be obtained. <br />Install remote control valves at locations no closer than 12 inches to walk edges, <br />buildings, and walls. Plastic pipe and fittings shall be solvent welded using <br />solvents and methods as recommended by manufacturer of the pipe, except <br />where screwed connections are required. Pipe and fittings shall be thoroughly <br />cleaned of dirt, dust and moisture before applying solvent with a nonsynthetic <br />bristle brush. Care should be taken not to use an excess amount of solvent, <br />thereby causing a burr or obstruction to form on the inside of the pipe. Allow <br />the joints to set at least 24 hours before applying pressure on PVC pipe. Do not <br />use PVC cement which has begun to gel. Do not attempt to make pipe <br />connections during inclement weather conditions. <br />least twelve inches beyond edges of paving or construction. <br />TESTING: All main lines shall be hydrostatically tested in the presence of the <br />Owner's representative at a pressure of 40 psi for a period of time not less than four <br />(4) hours, should any leaks be found, they shall be repaired. The line shall then be <br />retested until satisfactory. All lateral lines downstream from the remote control <br />valves shall be visually inspected for leaks, should any be found, they shall be <br />repaired. The line shall then be retested until satisfactory. <br />BACKFILL AND COMPACTING: After system is approved or sections thereof, <br />backfill excavations and trenches with clean soil, free of rubbish. Backfill for all <br />trenches, regardless of the type of pipe covered shall be compacted to a minimum <br />90% of its maximum density (AASHTO T-180). Dress off all areas to finish <br />paving, construction, etc., shall be encased in plastic pipe as specified, extending at <br />a. <br />to facilitate a trouble-free installation at the site. <br />site by the Contractor. <br />timing device (controller). <br />Contractor's construction. <br />graphic representation of sprinkler zones. <br />to be covered and any special conditions involved. <br />The contractor is responsible for his own bathroom and drinking facilities. <br />Prior to excavation, verify in the field the location and depth of all new and existing <br />utilities and take proper precautions not to damage or disturb such utilities. <br />Repair to original condition, new and existing utilities and other work damaged by <br />In the case of damages to the irrigation system caused by others, the cost of <br /> repairing the work shall be paid by the party causing said damage. <br />After completion of piping installation, Contractor shall furnish the Owner's <br />representative a reproducible "as built" drawing showing all sprinkler heads, <br />valves, and pipelines to reasonable scale, and provide a minimum of two <br />dimensions taken from fixed obvious objects to each automatic control valve, and <br />quick coupling valve. The Contractor shall also furnish a drawing showing a <br />Instruction sheets and parts lists covering all operating equipment shall be bound <br />into a folder and furnished to the Owner's representative or Landscape Architect in <br />two (2) copies. The Owner reserves the right to withhold 10% of the contract <br />amount until the "as built" drawings and instructions and parts lists folders are <br />Guarantee workmanship for a period of one year after date of final acceptance. In <br />addition, see to the fulfillment of all manufacturer's warranties. <br />The Contractor shall provide the Owner with a written guarantee stating everything <br />Should any objectionable materials such as old concrete, bricks or other debris <br />be encountered during the installation operation, they shall be removed from the <br />Crossings under paved areas as indicated, shall be installed by the Contractor. <br />Crossings shall be installed prior to compaction of subgrade. <br />Irrigation installation shall not begin until rough grades have been established. <br />Contractor shall be responsible for coordinating his work with all other parties <br />involved with the job, and shall coordinate the supply of electrical power to the <br />Upon substantial completion of work, the Contractor shall request a <br />walk-through by the Landscape Architect to formulate a "punch list". <br />Contractor shall complete "punch list" items as quickly as possible, and <br />request another walk-through to verify completion. Upon successful <br />completion of the "punch list" items, the work will be accepted by the Owner. <br />received. <br />GUARANTEE <br />A. <br />B. <br />8. <br />SUBMITTALS <br />B. <br />7. <br />A. <br />B. <br />C. <br />A. <br />UTILITIES6 <br />C. <br />3. <br />4. <br />2. <br />1. <br />SCHEDULING <br />2. <br />B. <br />grades. <br />F. <br />E. <br />D. <br />involved. <br />C. <br />b. <br />PIPE LINE ASSEMBLY <br />proposed plant material locations. <br />other permanent obstacles. <br />2. <br />1. <br />B. <br />4. <br />3. <br />Design modifications may be made only as necessary to meet field conditions and <br />only as acceptable to Landscape Architect. Piping shown on plans is <br />diagrammatically routed for clarity - route to avoid conflict with specimen plants <br />and adjust as necessary to accommodate landscape construction. <br />Contractor shall be responsible for verification at the site of all conditions and <br />dimensions shown on the plans prior to commencement of work. <br />CODES AND STANDARDS: Work shall comply with the American Society for <br />Testing and Materials (ASTM) and National Electrical Code. <br />REQUIREMENTS OF REGULATORY AGENCIES: Work shall comply with <br />codes, ordinances, and regulations of all governing authorities <br />WATER TESTING: Contractor shall test the salt content (chlorides and t.d.s) of <br />PRODUCT HANDLING: The Contractor shall protect all materials and work against <br />injury from any cause and shall provide and maintain all necessary safeguards for the <br />protection of the public. He shall be liable for any damage or injury to person or <br />property which may occur as a result of his negligence in the prosecution of the work. <br />Inspection: Contractor must examine the areas and conditions under which <br />landscape irrigation system is to be installed and notify the Landscape Architect <br />in writing of conditions detrimental to the proper and timely completion of the <br />work. Do not proceed with the work until unsatisfactory conditions have been <br />corrected. Contractor shall fully acquaint himself with related planting, <br />electrical, paving, site and utilities work to preclude any misunderstanding and <br />1. <br />JOB CONDITIONS <br />EXISTING CONDITIONS <br />5. <br />A. <br />the irrigation well. <br />F. <br />4. <br />E. <br />C. <br />D. <br />B. <br />EXCAVATING AND TRENCHING: <br />2. <br />1. <br />A. <br />PART 3 - EXECUTION <br />Owner. <br />INSTALLATION2. <br />1. <br />only at valve or tee locations. <br />9. <br />10. <br />Rights of Ways shall be installed at a depth of no less than the ten times the diameter <br />of the pipe size <br />5 EARTH GROUND (Per manufacturer's recommendations) <br />4 <br />5 <br />3 <br />2 <br />1 <br />PRIMARY AC WIRING (MUST RUN IN SEPARATE CONDUIT)4 <br />CONDUIT SWEEP(S) FOR SOLENOID WIRES3 <br />CONCRETE SLAB (2"/50MM ABOVE GRADE)2 <br />1 ACC99D-PP pedestal <br />SCALE: N.T.S. <br />ICORE D CONTROLLER INSTALLATION DETAIL <br />THE CONTRACTOR IS TO SUPPLY AND <br />INSTALL THE CONTROLLER HOUSING ON A <br />SLAB, 36"X36"X4" ACCORDING TO <br />MANUFACTURERS SUGGESTED <br />ATTACHMENT. <br />DRILL 1/2" DRAIN HOLE IN <br /> <br />ALUMNINUM POLE <br />CONCRETE FOOTER 2000 PSI, <br /> <br />MINIMUM, TOP SHAPED TO DRAIN. <br />1" ELECTRICAL CONDUIT FASTENED <br /> <br />SECURELY TO FOOTER. <br />HOLES DRILLED IN POLE FOR WIRE <br /> <br />ACCESS HERE AND AT BASE FOR <br /> <br />CONDUIT <br />RAIN SWITCH/SENSOR AS SPECIFIED, <br /> <br />MOUNTED PER MANUFACTURER'S <br /> <br />RECOMMENDATION. <br />STANDARD ALUMINUM <br /> <br />FENCE POLE.12 <br />' <br />36 <br />" <br />12 <br />" <br />WIRES TO <br /> <br />CONTROLLER <br />18" <br />RAIN SENSOR WIRES RUN <br /> <br />WITHIN POLE. <br />IRRIGATION DETAIL - RAINSWITCH <br />MOUNTING <br />NOT TO SCALE <br />5. PVC. MALE ADAPTER <br />CORRECT INSTALLATION DIMENSIONS) <br />(INSTALL LENGTH AS NECESSARY FOR <br />(NOT SHOWN) <br />PVC SCHEDULE 80 CLOSE NIPPLE <br />8" DEEP. <br />PVC SCHEDULE 80 NIPPLE. <br />PVC SCHEDULE 80 TOE NIPPLE. <br />HARCO D.I.P. SERVICE TEE <br />WIRE CONNECTOR AND 30" EXPANSION LOOP <br />KING BROS. BTU TRUE UNION SERIES PVC <br />CHATAHOOCHEE RIVER WASHED STONE <br />VALVES ON SAME FIELD SATELLITE. <br />COMMON WIRE TO OTHER TO OTHER <br />COMMON BRICK (4 MINIMUM REQUIRED). <br />PVC PIPE TO SPRINKLERS. ANGLE PIPE TO <br />IN 1" DIA. COIL. <br />PVC SCH. 40 SxS 45 DEG. ELL. <br />CONTROL/COMMON WIRES FROM <br />FIELD SATELLITE./ OR DECODERS. USE AWG 12 <br />WIRE. <br />BALL VALVE WITH FEMALE THREADED ENDS. <br />SPECIFIED DEPTH WITH 45Ā ELLS. <br />PVC SCHEDULE 80 FPT X FPT 90 DEG. ELL <br />18. <br />REQUIRED FOR DRIP VALVES. <br />WITH FLOWS LESS THAN 20 GPM. <br />PRV SHALL BE SAME SIZE AS <br />ELECTRIC CONTROL VALVE. NOT <br />OF ALL ELECTRIC CONTROL VALVES <br />ELEVATION <br />INSTALL WILKINS # 500 PRESSURE <br />REGULATING VALVE DOWN STREAM <br />14 <br />NOTE: <br />ELEVATION <br />10 <br />15 <br />18 <br />17 <br />12 <br />15 <br />* <br />10 <br />16. <br />15. <br />17. <br />13. <br />14. <br />12. <br />15 <br />2" <br />16 9 <br />6" <br />7 8 <br />6 <br />11. <br />10. <br />9. <br />8. <br />7. <br />6. <br />LEGEND <br />CHRISTY'S I.D.TAG - NUMBERED TO <br />RECTANGULAR VALVE BOX W/ <br />PURPLE if required <br />ELECTRIC CONTROL VALVE. <br />FINISH GRADE. <br />MATCH DRAWINGS. <br />BOLT DOWN COVER. <br />1311 1 2 <br />1. <br />3 4 <br />4. <br />3. <br />2. <br />SCALE: N.T.S. <br />CONTROL VALVE DETAIL <br />LOCATE IC 100 DECODER <br /> <br />IN VALVE BOX WITH VALVE. <br /> <br /> <br /> <br />ALL WIRE CONNECTIONS TO BE <br /> <br />TWISTED AT CONNECTIONS OF WIRE AND <br /> <br />INSTALLED IN WATERPROOF CONNECTORS <br /> <br />SUPPLIED WITH DECODERS <br /> SHEET IR-5 <br />XX <br />IRRIGATION DETAIL <br />WITH ISOLATION VALVE <br />SCALE: 1.5" = 1'-0" <br />R <br />ICV 1" GLOBE VALVE <br />FINISH GRADE <br />3/4" MINUS WASHED GRAVEL <br />BRICK SUPPORTS (4) <br />MAIN LINE PIPE & FITTINGS <br />STANDARD VALVE BOX <br />WATERPROOF CONNECTORS (2) <br />18-24" COILED WIRE <br />GATE VALVE LINE SIZED <br />PVC SLIP UNIONS <br />WITH FILTER SENTRY <br />SCH 80 T.O.E. NIPPLE(5) <br />REMOTE CONTROL VALVE MODEL <br />ICV-101G ACCU-SYNC-XX <br /> <br />NOTE; ACCU-SYNC-XX IS AVAILABLE IN <br />PRESSURE REGULATION SETTINGS OF 20, 30, <br />40, 50 AND 70 PSI. <br />JS11-25-14 2 Revised for underground utilities <br />and meter location <br />Date: 8-25-14 Drawn By: JS <br />ROAD NO.COUNTY <br />BY DESCRIPTIONDATE BY DESCRIPTIONDATE <br />REVISIONS <br />FINANCIAL PROJECT ID <br />SHEET <br />NO. <br />! <br />174th Street Roadway Improvements! <br />The City of Sunny Isles Beach, Fl. <br />j a m e s s a n t i a g o <br />landscape architecture and design <br />612 NE 14th Ave. Unit A, Fort Lauderdale, Fl. 33304 <br />Tel. 305-791-3156 <br /> <br /> Email, Jsantiagolainc@Gmail.com <br />JS O'Leary Comments11-11-14 1