My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(17-05-01) City Wide Landscape Maintenance Services
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 10:00:02 AM
Creation date
6/29/2017 9:58:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal] <br />ceb <br />Date Proposal # <br />LANDSCAPING <br />2711 Southwest 36th Street 9/7/2016 0916137 <br />Dania Beach Florida 33312 <br />PHONE: 954-431-1111 <br />FAX: 954-433-1111 <br />The City of Sunny Isles Beach Ship To <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />Attention: Robert Williamson <br />EMAIL P.O. NUMBER PROJECT DIVISION <br />APPROVED <br />REP <br />BY: <br />lyn@lslmat.comlslmgt.com Schecules-2016/2017 7060 Inst... GV <br />Description Qty Cost Total <br />Golden Shores Park weekly maintenance as per contract line 5, item E5 and resolution 52 200.00 10,400.00 <br />2012-1953 <br />Heritage Park weekly maintenance as per contract line 6, item E6 and resolution 2012-1953 52 625.00 32,500.00 <br />Intracoastal Parks(16000-16200) Collins Avenue Park weekly maintenance as per contract 52 575.00 29,900.00 <br />line 12, item E12 and resolution 2012-1953 <br />Gateway Park weekly maintenance as per contract line 13, item El3 and resolution 2012-1953 52 1,250.00 65,000.00 <br />SECTION E PARKS - SUBTOTAL: 220400.00 <br />SEASONAL ANNUALS (3 times per year)-RIGHT OF WAYS: <br />WILLIAM LEHMAN CAUSEWAY: <br />600 @ 3 plantings- Seasonal Color Replacement: Plant 4.5 inch Annuals and remove old 1,800 1.20 2,160.00 <br />plantings; and fertilize with Osmocote -as per contract line 74, item Al and resolution <br />2012-1953 <br />CITY HALL: <br />1200 @ 3 plantings- Seasonal Color Replacement: Plant 4.5 inch Annuals and remove old 3,600 1.20 4,320.00 <br />plantings; and fertilize with Osmocote-as per contract line 74, item Al and resolution <br />2012-1953 <br />TONY ROMAS: <br />375 @ 3 plantings- Seasonal Color Replacement: Plant 4.5 inch Annuals and remove old 1,125 1.20 1,350.00 <br />plantings; and fertilize with Osmocote-as per contract line 74, item A 1 and resolution <br />2012-1953 <br />WINSTON BOULEVARD-ALL BULL NOSES: <br />2,000 @ 3 plantings- Seasonal Color Replacement: Plant 4.5 inch Annuals and remove old 6,000 1.20 7,200.00 <br />plantings; and fertilize with Osmocote-as per contract line 74, item Al and resolution <br />2012-1953 <br />COLLINS -826 INTERCHANGE ISLAND: <br />1,200 @ 3 plantings- Seasonal Color Replacement: Plant 4.5 inch Annuals and remove old 3,600 1.20 4,320.00 <br />plantings; and fertilize with Osmocote-as per contract line 74, item Al and resolution <br />2012-1953 <br />IF APPROVED,PLEASE SIGN: Total! <br />Void after 90 days <br />INSTALLED AND APPROVED Page 6 <br />i;
The URL can be used to link to this page
Your browser does not support the video tag.