Laserfiche WebLink
S M C PROPOSAL <br /> AIR CONDITIONING Date: May 4, 2017 <br /> HEATING 8 REFRIGERATION <br /> Licensed&Insured <br /> CMC 1249636 • <br /> Annual Inspection <br /> 1. Inspect for refrigerant and oil leaks. <br /> 2. Inspect vibration eliminators and water piping for leaks. <br /> 3. Check freeze protection,evaporator and piping heaters, glycol content. <br /> 4. Check and blow down water piping strainers. <br /> 5. Check refrigerant in sightglass. <br /> 6. Check compressor oil presence in sightglass, if applicable. • <br /> 7. Inspect and tighten electrical connections. <br /> 8. Check relays and operating/safety controls. <br /> 9. Check crankcase heater operation. <br /> 10. Meg hermetic motor. <br /> I I. Check operation of electronic expansion valve. <br /> 12. Perform MicroTech check, log, and last fault analysis,analyze performance. <br /> 13. Check and clean condenser coils,clean debris from around condenser, air cooled units. <br /> 14. Check condenser fan operation,air cooled units. <br /> __ Operating Inspection <br /> I. Inspect for refrigerant and oil leaks. <br /> 2. Inspect vibration eliminators and inspect water piping for leaks. <br /> 3. Check and blow down water piping strainers. <br /> 4. Check refrigerant in sightglass. <br /> 5. Check compressor oil presence in sightglass, if applicable. <br /> • 6. Inspect and tighten electrical connections. <br /> 7. Check relays and operating/safety controls. <br /> 8. Check crankcase heater operation. <br /> 9. Perform MicroTech check, log, and last fault analysis,analyze performance. <br /> 10. Check condenser coils,clean debris from around condenser,Model AGZ air cooled units. <br /> 11. Take and record water side pressure drops across vessels. <br /> Lead time for equipment delivery: 10-13 weeks (anti-corrosion coating adds time to the production) <br /> All work will be performed according to the above scope of work,any deviation from such involving changes and extra cost,will be executed only upon written,signed <br /> change order and will be subject to charge over and above this proposal price. A finance charge of 1.5%(18%yearly)will be charged on balance over 30 days.All <br /> material supplied by SMC Air Conditioning shall remain property of SMC Air Conditioning until the contract work plus any work has been paid.Cost incurred as a result <br /> of non-payment,including court cost,late fees,collection fees,attorney fee,etc will be paid by the customer.Summa Mechanical is not responsible for any existing code <br /> violations. <br /> Acceptance of Proposal:Must be provided within five business days of proposal date.The above prices,specifications and conditions <br /> are satisfactory and are hereby accepted.SMC Air Conditioning is authorized to do the work as specified.Payment will be made as state <br /> above. <br /> I CERTIFY THAT I AM AUTHORIZED TO MAKE PURCHASES <br /> PRINT NAME <br /> ON BEHALF OF City of Sunny Isles <br /> Customer Signature Print Name Date <br /> Phone:(954)562-8161 1 Fax:(954)434-01881 E-mail:sales@smcac.com Page 2 of 2 <br /> SMC Air Conditioning 15071 S. State Rd 7 STE 705 Davie,FL 33314 Customer Initials <br />