Laserfiche WebLink
Page 2 <br /> before we begin construction. Failure to execute the applicable Agreement and pay the <br /> C.I.A.C. specified in the Agreement within the 180 day time limit, or termination of the <br /> Agreement, shall result in the expiration of the binding cost estimate. However, if you <br /> choose to cancel your request or not respond in time, your engineering deposit will not be <br /> returned and the estimate will be withdrawn. <br /> This estimate only includes the charges to be paid to FPL. There are additional costs which <br /> are the customer's responsibility and should also be considered. These potential costs <br /> include: <br /> • Site restoration(sod, landscaping, pavement, sidewalks, etc). <br /> • Rearrangement of customer electric service entrances (requires electrician)from <br /> overhead to underground. Also, additional customer expense if local inspecting <br /> authorities require customer wiring to be brought up to current codes. <br /> • Removal and burial of other utilities (e.g. telecom, CATV, etc.). <br /> • Any project scope changes that modify the enclosed drawings. <br /> • Acquiring, describing, securing and recording of easements for underground <br /> facilities. <br /> In addition, attached is the additional estimate the City requested for Phase#IA. <br /> • Customer Performs Some Work—Conduit& Concrete Products Installation. <br /> We look forward to working with you and your staff as this project progresses. If you have <br /> any questions,please contact me at 561-845-4624. <br /> Sincerely, <br /> John C. Lehr, Jr. <br /> Manager, OH/UG Conversions <br /> Power Delivery <br /> FPL <br /> Attachments <br /> a NextEra Energy,Inc.company <br />