My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2709
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2709
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2017 2:43:37 PM
Creation date
7/21/2017 2:36:21 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2709
Date (mm/dd/yyyy)
06/15/2017
Description
Approve Payment to FPL for Collins Ave Utilities Undergrounding
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> before we begin construction. Failure to execute the applicable Agreement and pay the <br /> C.I.A.C. specified in the Agreement within the 180 day time limit, or termination of the <br /> Agreement, shall result in the expiration of the binding cost estimate. However, if you <br /> choose to cancel your request or not respond in time, your engineering deposit will not be <br /> returned and the estimate will be withdrawn. <br /> This estimate only includes the charges to be paid to FPL. There are additional costs which <br /> are the customer's responsibility and should also be considered. These potential costs <br /> include: <br /> • Site restoration(sod, landscaping, pavement, sidewalks, etc). <br /> • Rearrangement of customer electric service entrances (requires electrician)from <br /> overhead to underground. Also, additional customer expense if local inspecting <br /> authorities require customer wiring to be brought up to current codes. <br /> • Removal and burial of other utilities (e.g. telecom, CATV, etc.). <br /> • Any project scope changes that modify the enclosed drawings. <br /> • Acquiring, describing, securing and recording of easements for underground <br /> facilities. <br /> In addition, attached is the additional estimate the City requested for Phase#IA. <br /> • Customer Performs Some Work—Conduit& Concrete Products Installation. <br /> We look forward to working with you and your staff as this project progresses. If you have <br /> any questions,please contact me at 561-845-4624. <br /> Sincerely, <br /> John C. Lehr, Jr. <br /> Manager, OH/UG Conversions <br /> Power Delivery <br /> FPL <br /> Attachments <br /> a NextEra Energy,Inc.company <br />
The URL can be used to link to this page
Your browser does not support the video tag.