Laserfiche WebLink
C. Schematic landscape plans nor construction documents are not included. <br /> D. One(1) City Staff Meeting and one (1) Community Meeting are included. <br /> E. One(1)round of minor revisions are included. <br /> IV. Professional Government Consulting Services & Sub Consultants <br /> A. Work in conjunction with Joel Wadsworth of Construction Department to manage <br /> the environmental, utility and building department permits. <br /> 1. Manage EAS (Sub-Consultant)to obtain the following environmental <br /> permits or approvals: PERA(F.K.A. DERM),USACE&USCG. <br /> • This includes application, responses to all RAI,mitigation <br /> designs (after obtaining potential City owned land information <br /> from City staff), and permit sketches. <br /> B. Manage the completion of all outstanding drawings being performed by CGA <br /> departments: <br /> 1. Civil/Drainage Plans <br /> 2. Electrical/Lighting <br /> 3. Pavement Marking& Signage Plans <br /> C. Manage the completion of the structural plans which are to be completed by others. <br /> The scope for the completion of the structural plans is outlined in BHA's proposal. <br /> D. Attend one(1)public meeting to address adjacent property owner concerns. <br /> E. Utility Location and Coordination <br /> 1. Send correspondence to all utilities requesting utility locations and as- <br /> builts. <br /> 2. Utilize a subcontractor to perform utility location with ground <br /> penetrating radar. <br /> 6,s <br />