My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2611
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 11:34:03 AM
Creation date
8/8/2017 11:33:56 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2611
Date (mm/dd/yyyy)
10/20/2016
Description
Sixth Amendment to Agmt w/ Calvin Giordano & Associates for Professional Landscape Arch. Svcs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. Professional Construction Services <br /> A. Work in conjunction with Chris Giordano of Government Services Department to <br /> manage the environmental,utility and building department permits. <br /> 1. Manage EAS (Sub-Consultant)to obtain the following environmental <br /> permits or approvals: PERA, USACE&USCG. <br /> • This includes application,responses to all RAI, mitigation <br /> designs(after obtaining potential City owned land information <br /> from City staff),and permit sketches. <br /> B. Manage the completion of all outstanding drawings being performed by CGA <br /> Departments: <br /> 1. Civil/Drainage Plans <br /> 2. Electrical/Lighting <br /> 3. Pavement Marking&Signage <br /> C. Manage the completion of the structural plans which are to be completed by others. <br /> The scope and cost for the completion of the structural plans is outlined in BHA's <br /> proposal. <br /> D. Attend one(1)public meeting to address adjacent property owner concerns. <br /> VI. Professional Surveying Services <br /> A. Prepare Bathymetric Survey of Canal From eastern terminus to the intersection <br /> with the Intracoastal Waterway. <br /> B. Prepare "Route Survey"of proposed North Bay Road and the proposed bridge <br /> crossing the Canal. Limits of the survey will be as follows; on the north by NE <br /> 174th Street, on the south by NE 172nd Street on the east and west by a line 50' <br /> each side of the centerline/baseline of construction.The survey will establish,on <br /> the ground, the centerline of the roadway and the baseline of construction of the <br /> bridge. Survey will include horizontal location as well as rim and invert elevations <br /> of all visible utility structures within the survey corridor. Survey will be made in <br /> accordance with Minimum Technical Standards for Land Surveys in the State of <br /> Florida as defined by Chapter 5J-17.050-.052,Florida Administrative Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.