Laserfiche WebLink
171 ( 17...C2 I a ce <br /> gir <br /> METHODOLOGY OF INTERVENTION FOR ASSEMBLY <br /> ® FROM THE PLANNING WE GIVE YOU ... <br /> The chiller can be delivered ahead of this schedule if needed <br /> Markup and implementation of site safety zone <br /> ® 1. Arrival of the rink and unloading equipment. <br /> 2. Connecting the chiller for functional heating oil <br /> 3. Setting up the carpet of ice and collectors <br /> 4. Installation ice carpet <br /> 5. Initial pressure of 6 bar Icemat for control <br /> ® 6. Check the carpet pressurized <br /> 7. Filling the water circuit glycol food by covering open buffer <br /> 8. Starting the chiller and temperature down to 6,8 °F <br /> 9. Check all connections before impoundment <br /> ® 10. Commissioning and start water ice climbing <br /> 11. Fitting the railing. <br /> 12. Climb ice <br /> 13. Establishment of a white thread in the ice <br /> 14. Climb ice until the ice is ready to skate <br /> ® 15. Delivery of the rink and Customer Training <br /> Explanation of thicknesses management panel and ice temperatures <br /> DURING OPERATION <br /> ® EMERGENCY NUMBER <br /> ✓ 24h/24 <br /> ✓ 7j/7 <br /> ✓ action if necessary <br /> METHODOLOGY OF INTERVENTION FOR DISASSEMBLY <br /> Day after operation : <br /> Stop machines <br /> UPON OUR ARRIVAL <br /> Timing of intervention 4 days <br /> 1. Melting ice by boiler to prevent the evacuation of the ice <br /> 2. Recovery of brine in barrels <br /> ® 3. Remove the guardrails <br /> 4. Dismantling of the track and collectors <br /> 5. Repackaging of the rink equipment <br /> ® 6. Loading and departure rink equipment <br /> ® SYNERGLACE USA I Request for Proposal No. 17-10-02 Page 23 on 60 <br />