My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-2000
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2012 10:58:11 AM
Creation date
11/20/2012 10:58:10 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-2000
Date (mm/dd/yyyy)
11/15/2012
Description
CO#7 w/ Shoreline Foundation for Newport Fishing Pier Demo & Const. Proj.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®%y Calvin, Giordano & Associates, Inc. <br /> " E X C E P T I O N A L S O L U T I O N S <br /> ❑ Fort Lauderdale Office-1800 Eller Drive,Suite 600,Fort Lauderdale,Florida 33316 <br /> Phone:954.921.7781 • Fax:954.921.8807 Memorandum <br /> ❑ Palm Beach Office-560 Village Blvd.,Suite 340,West Palm Beach,Florida 33409 <br /> Phone:561.684.6161 • Fax:561.684.6360 <br /> DATE: 11/15/12 <br /> SUBJECT: Newport Fishing Pier& Restaurant <br /> FROM: Joel Wadsworth, Chris Giordano CGA <br /> Re: A Resolution approving a Contract Amendment with Shoreline Foundation, <br /> Inc. for additional work to the Newport Fishing Pier& Restaurant. <br /> RECOMMENDATION: <br /> It is recommended City Commission approve the contract amendment. <br /> REASONS: <br /> In a previously adopted resolution in September 2010,the City approved a contract with Shoreline Foundation,Inc. <br /> for the reconstruction of the Newport Fishing Pier&Restaurant.At the time of the contract the project was still <br /> being permitted by the Federal,State and Local agencies having jurisdiction.All of the required permits and <br /> approvals were obtained and a Building Permit was issued in July 2012.At the time of the contract with Shoreline <br /> Foundation,Inc.the project consisted of a"shell only"building consisting of minimal mechanical,plumbing and <br /> electrical components.The plans permitted in July 2012 consist of modifications requested by City staff and the <br /> City's fmancial partner. The permitted plans consist of updated mechanical,plumbing and electrical components as <br /> well as modifications to the structure,windows and doors and partition framing.The plans also consist of <br /> modifications required by the permitting agencies including railings,water distribution,signage,mechanical and fire <br /> protection. <br /> The Contractor,Shoreline Foundation, Inc.with input from their subcontractors has provided pricing for the <br /> additional scope of work requested by the City and the permitting agencies. <br /> The Contractor has also requested to be reimbursed for additional costs incurred due to unforeseen conditions during <br /> the installation of the precast concrete pile foundations of both the Restaurant and Pier. <br /> The revised project will provide the rough mechanical,plumbing,electrical and partition framing coordinated with <br /> the layout provided by the City and its partner. The facility will be ready for tenant build-out by others to complete <br /> the flooring,kitchen appliances,food service and other FF&E amenities necessary to complete. <br /> COST: <br /> The Contractors Change Order Request is for$629,100.40 and a time extension of 127 calendar days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.