My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southern Underground Industries Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Responses
>
Southern Underground Industries Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2012 12:05:46 PM
Creation date
11/26/2012 12:05:41 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cr RIC-iVIAN INTERNATIONAL, INC. <br /> GENERAL COMPACTORS <br /> 2601 N.W.48th Street•Pompano Beach, Florida 33073 <br /> BROWARD: (954)426-1042 •FAX:(954)426-0717 <br /> www.Ric-man.us <br /> January 9, 2006 <br /> To Whom It May Concern: <br /> As Project Manager for Ric-Man International, it is with great pleasure that I write this Letter of <br /> Recommendation for Belseri Comerford. Recently, I had the pleasure to have Belseri `Benny" <br /> on my team as our foreman on the Village of Wellington Water Transmission Main Extension <br /> Phase I Project we recently completed. <br /> The project consisted of the installation of approximately 6.000 LF of 24" PVC Water Main <br /> along a neighborhood arterial roadway. The project presented many challenges, including <br /> sensitive environmental concerns, deep conflicts with existing utilities, challenges with <br /> Maintenance of Traffic along the work zone, and dewatering challenges which we solved via <br /> wellpoints. Throughout the execution of the project, Benny showed exemplary competence in <br /> the installation of large pipelines in varying ground conditions. <br /> Through diligent planning and foresight, Benny was able to advise me of necessary parts, <br /> fittings, and conflicts ahead of time to alleviate any impact they would have on the project <br /> timeline. He showed a diverse skillset by installing wellpoints and pipeline each day while <br /> maintaining a clean work zone. This resulted in an owner with minimal complaints and who was <br /> very content with the outcome and performance of the project. I hope to have the opportunity to <br /> work with Benny again on future projects and I would be happy to discuss his performance in <br /> more detail with anyone interested. <br /> Please feel free to contact me for any additional information at the number below. <br /> Respectfully, <br /> c==_#;e7X6S <br /> Juan Barreneche, P.E. <br /> Project Manager <br /> Ric.Man International <br /> C: 954-650-4699 <br />
The URL can be used to link to this page
Your browser does not support the video tag.