My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Responses
>
Ric-Man
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2012 2:02:19 PM
Creation date
11/26/2012 2:02:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Victor G. Menocal inC <br /> 111117161E. <br /> _,„.._"� <br /> Project Manager <br /> Mr. Menocal has over 10 years experience in construction management. He has the experience of <br /> V( r-\`s I overseeing projects ranging from $1.5 million up to $177 million. The project scopes ranges from <br /> / 4 water main. gravity sewer, force mains. drainage, pump stations. lift stations, directional drilling. <br /> k� I streetscape improvements, lighting; traffic signal improvements, ITS. neighborhood improvements <br /> 3/414 and bridges. His experience includes approximately 7 major neighborhood improvement projects of <br /> over 500 homes each. Mr. Menocal has an excellent knowledge of construction software such as <br /> Primavera Project Planner(P3). SureTrak. Microsoft Projects, Expedition. E-Builder and others. <br /> Highlights <br /> Roadway and Infrastructure construction experience since 2000 (10 years) <br /> 6 years of Design Build experience <br /> Underground Utility Construction from 4" to 48" Pipelines <br /> Has worked with the Hazen and Sawyer team for 7 years which served as the Program Manager for the City <br /> of Miami Beach's Infrastructure Improvement Program—Approximately $200 million <br /> Holds a B.S. from Florida International University <br /> Army Corp of Engineers: Construction Quality Management for Contractors Certificate <br /> Workzone Traffic Control: Advanced Level Certified <br /> OSHA 30-Hr Training Certification #600429738 <br /> Experience <br /> Project Manager—2010 to Present -Ric-Man International. Inc. - up to $21 million dollar projects <br /> Project Manager—2009—Condone America—up to $177 million dollar project <br /> Project Manager—2000 to 2009 -A2 Group. Inc. - up to$42 million dollar projects <br /> Key Projects <br /> Town of Surfside infrastructure rehabilitation project — Project consist of t <br /> infrastructure improvements to Town of Surfside including the replacement of \, ,e <br /> approximately 31,000 LF of water main, 5,600 LF of RCP drain e 1 r"V <br /> PP g Qom- �j.__. <br /> conveyance pipe. 9 drainage wells. 58 drainage structures, 3 drainage pump s�r-s L'` <br /> stations, rehabilitation of 49,000 LF of sewer system and rehabilitation of 2 . ::�` -z° 21 2- i <br /> sewer pump stations. Approximately $16 million budget. rr s"t■ <br /> Broadview Park BP 2 Neighborhood Improvements (Broward County Water & Wastewater Division) <br /> Project consists of approximately 36,000 LF of sewer with over 150 MAS, 15.000 LF of drainage mains <br /> including 170 structures. 3 lift stations, landscaping, streetscapes, road reconstruction and milling / <br /> resurfacing. Approximately $17 million budget. <br /> Flamingo BP 10E Neighborhood Improvements (Miami Beach. Fl) Design / ! ;!:w I(p <br /> Build Project consisted of the replacement of 5.100 LF of water main. 3.800 LF of , tb: d <br /> c <br /> drainage mains with over 109 drainage structures including 10 gravity wells. The j'r yc.e; •t,.. "'^ ^ <br /> project boundaries were from Washington Ave. to Meridian Avenue from 7's St. to 1 � �--e,�l mod` <br /> 9th Street. This project required a major coordination effort with the restaurants, _. <br /> night clubs. other existing businesses, residents. school. and public transportation. r ,Lv <br /> Approximately $4.5 million project budget. 'v <br /> SR7 Water Main Replacement (Broward County Water & Wastewater Division) Over 9,800 LF of water <br /> main replacement along SR7 from NW 5th Street to Peters Road. Approximately $1.6 million budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.