My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hellas Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
Responses
>
Hellas Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 12:09:59 PM
Creation date
12/13/2012 12:09:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Artificial Turf for Senator Gwen Margolis & Pelican C.Parks
Bid No. (xx-xx-xx)
12-10-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach Florid, <br /> ID (Task Name I Duration I Start I Finish <br /> I <br /> 1 City`ot.Sunnylsles=Beach.Fefida a,,,ECrt" .x ` ?" s',119days=..Mon>3/4/13 - Th`u8/15/13 4 <br /> 2 . 'Design Development/Permitting Schedule=, ', 71 days ; ".Mon 3/4/13 T. Mon 6/10/13A <br /> 3 Notice to Proceed 0 days Mon 3/4/13 Mon 3/4/13 <br /> 4 I Contracts 10 days Mon 3/4/13 Fri 3/15/13 <br /> 5 I Project Engineering & Design 30 days Mon 3/18/13 Fri 4/26/13 <br /> 6 I Owner Review of Design Documents 10 days Mon 4/29/13 Fri 5/10/13 <br /> 7 I Permits 20 days Mon 5/13/13 Fri 6/7/13 <br /> 8 Submittals 10 days Mon 5/13/13 Fri 5/24/13 <br /> 9 Pre-Construction Meeting 1 day Mon 6/10/13 Mon 6/10/13 <br /> 10 Construction Schedule3Matgolis:Patk- ' 29days._ = Tue 6/11/13-. .Tue7/9/13: <br /> 11 Mobilization 4 days Tue 6/11/13 Fri 6/14/13 <br /> 12 Utility Locate & Irrigation Shut-Off 1 day Mon 6/17/13 Mon 6/17/13 <br /> 13 Establish Site Access & Staging Area 1 day Mon 6/17/13 Mon 6/17/13 <br /> 14 Excavation to Subgrade 3 days Tue 6/18/13 Thu 6/20/13 <br /> 15 Concrete Perimeter Curb 7 days Fri 6/21/13 Mon 7/1/13 <br /> 16 Install HDPE Collector Pipe System 4 days Wed 6/26/13 Mon 7/1/13 • <br /> 17 Install Geotextile and Composite Drain 1 day Tue 7/2/13 Tue 7/2/13 <br /> 16 Install Drainage Aggregate 6 days Tue 7/2/13 Tue 7/9/13 <br /> 19 <br /> 20 Synthetic Turf- Installation -r-,,- ,68days Sat:6/8/113 . Wed <br /> 21 Synthetic Turf Material Order 20 days Sat 6/8/13 Thu 6/27/13 <br /> 22 1 Synthetic Turf& Pad Material Delivery 2 days Mon 7/8/13 Tue 7/9/13 <br /> 23 Synthetic Turf& Pad Installation 24 days Wed 7/10/13 Mon 8/12/13 <br /> 24 Construction Punch List& Clean Up 2 days Tue 8/13/13 Wed 8/14/13 <br /> 25 <br /> 26 Construction Schedule Pelican Park __T '22 days. _ ` Fri 6/21/13.. Fri 7/12/13 j <br /> 27 Utility Locate & Shut-Off 1 day Fri 6/21/13 Fri 6/21/13 <br /> 28 Establish Site Access 1 day Mon 6/24/13 Mon 6/24/13 <br /> 29 Excavation to Subgrade 2 days Tue 6/25/13 Wed 6/26/13 <br /> 30 Concrete Perimeter Curb 6 days Thu 6/27/13 Thu 7/4/13 <br /> 31 Install HDPE Collector Pipe System 4 days Mon 7/1/13 Thu 7/4/13 <br /> 32 Install Geotextile and Composite Drain 1 day Fri 7/5/13 Fri 7/5/13 <br /> 33 Install Drainage Aggregate 5 days Mon 7/8/13 Fri 7/12/13 <br /> 34 <br /> 35 - -SyntheticTurf-Installation _ _ 65days: ` Tue 6/11/13 Wed 8/141131 <br /> 36 Synthetic Turf Material Order 20 days Tue 6/11/13 Mon 7/8/13 <br /> 37 Synthetic Turf& Pad Material Delivery 2 days Thu 7/11/13 Fri 7/12/13 <br /> 38 Synthetic Turf& Pad Installation 21 days Mon 7/15/13 Mon 8/12/13 <br /> 39 Construction Punch List& Clean Up 2 days Tue 8/13/13 Wed 8/14/13 <br /> 40 1 _ <br /> 41 _ Project Closeout _ - - • 10 days Tue 8/6/13- Thu 8115/13 <br /> 42 Submit Closeouts 1 day Tue 8/6/13 Tue 8/6/13 <br /> 43 I Final Walk Through 1 day Thu 8/15/13 Thu 8/15/13 <br /> 44 ' Turf Warranties 1 day Thu 8/15/13 Thu 8/15/13 <br /> 45 Project Completion 0 days Thu 8/15/13 Thu 8/15/13 <br /> I Task t .a. a* Rolled Up Task Split <br /> \' City of Sunny Isles Beach Florida Critical Task m. Rolled Up Critical Task External Tasks <br /> Date:Tue 12/11/12 Milestone • Rolled Up Milestone O Project Summa <br /> Summary Rolled Up Progress ® Group By Sumr <br /> I <br />