My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GEO-Surfaces
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
Responses
>
GEO-Surfaces
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 2:45:36 PM
Creation date
12/13/2012 2:45:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Artificial Turf for Gwen Margolis & Pelican Community Parks
Bid No. (xx-xx-xx)
12-10-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I @ <br /> R. J. Griffin & Company <br /> eenmet Contractors <br /> IA ISA AMBER OF IKEA DWI CCIGrmICTTON CROP <br /> 1 February 24, 2010 <br /> .ATLANTA <br /> Geo-Surfaces <br /> Charles Dawson AUSTIN <br /> I 17827 N. Achord Road <br /> Baton Rouge, LA 70817 CIIANLOITE <br /> Re: Woodward Academy Synthetic Field COLWIA66 SPRINGS <br /> ICharles, 04L AS <br /> We have recently completed the 22 million dollar Athletic Complex at °LN'SN <br /> I Woodward Academy and I wanted to take time to thank you for an <br /> outstanding job on the athletic field. We worked with several sub- °Ff MOINES <br /> contractors on this and other projects and I have to say your team was one <br /> of the best. We appreciate the way your guys handled the time crunch we MOU6TON <br /> I were in and the way you were able to come through to help us meet the <br /> time restraints on your phase of the project. KANSAS CITY <br /> The staff at Woodward was extremely happy with not only the incredible MINNEAPOLIS <br /> I field but also the manner at which you attacked all of the challenges with <br /> this particular project and jobsite. The field itself has lived up to the play NASHVILLE <br /> characteristics you promised. No visible or moving infill is present on the <br /> field and the drainage is outstanding. At first, I was unsure of how the OKLAHOMA CITY <br /> I GeoFlo drainage blanket would perform but now that I have witnessed the OMAHA <br /> results I'm not sure if I would ever consider installing anything else under a <br /> synthetic playing surface. At one point this season,Woodward had the only m0E616 <br /> field in a 10 mile radius that remained playable through all of the record <br /> I rainfall. Even in the highest storm intensities not a single puddle or splash .06 AN6 <br /> was present and Woodward never cancelled a scheduled event due to rain. <br /> SEATTLE <br /> Again, thanks for a job well done and if we are ever contacted in the future <br /> 1 about the construction of a synthetic turf field you will be the first person I 6FN N6FIELO,MO <br /> call. Feel free to give my contact information to any prospective client that <br /> needs information about your products. Please let me know if I can ever be <br /> TOPEKA <br /> used as a reference or make a phone call on behalf of you or your <br /> Icompany. <br /> Sincerely, i - <br /> I <br /> 6:',.,u ciiim, <br /> IBrian Smallwood LEEDBI AP <br /> Project Manager <br /> I <br /> 600 MOUNT VERNON HWY.SUITE 200.ATLANTA.GA 50225 I TEL>770.6a121066 I FAX>/70.651.64113 I WWW.NIO°IFFIN.COM <br /> 26 <br /> IGlobal Synthetics Environmental,LLC • 6326 Highland Road • Baton Rouge.LA 70808. 225i907-4763 • T+Ww.geosurfaces.com <br /> RFP#12-19-03 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.