My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pro Grass
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
Responses
>
Pro Grass
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 3:16:20 PM
Creation date
12/13/2012 3:02:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Artificial Turf for Gwen Margolis & Pelican Community Parks
Bid No. (xx-xx-xx)
12-10-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2007-2008 Mechanicsburg Football Stadium <br /> Owner: Mechanicsburg Exempted Village Schools <br /> GC: LeVan's Excavating, Inc. <br /> Job: Installation of new stadium & field lighting, track, event areas, football field <br /> Original Contract: $780,000 <br /> Final Contract Amount: $850,506.70 <br /> Project Manager: Smoot Construction (Dan Shockey), 937-834-0158 <br /> Location: 60 High Street, Mechanicsburg, Ohio 43044 <br /> Phone: 937.834.2453 <br /> Fax: 937.834.3954 <br /> 2008 Urbana University Soccer Field <br /> Owner: Urbana University <br /> Job Description: Excavate and remove existing field, install 487' of 8" SDR 35, install yard drains with <br /> castings. install subgrade material, laser grade stone for turf, install underdrain system <br /> Owner Contact: Vincent, Urbana University, Urbana, Ohio 937-925-3306 <br /> Contract Amount: $189.000.00 <br /> 2009 North Union School Soccer Field <br /> Owner: North Union Schools <br /> 1 Job Description: Mobilize, excavate & remove existing field, install underdrains, place aggregate base, <br /> install asphalt entrance, construct concrete curb, laser grade field. <br /> Project Contact: Sprinturf, 900 Circle 75 Parkway. Suite 1750, Atlanta, GA 30339 <br /> Contract Amount: $91,363.00 <br /> 2010 Northwestern School Football Field <br /> Owner: Northwestern School District <br /> Project: Install approx. 620 LF of 8" SDR 35. bed pipe; laser grade field for turf installation. <br /> Project Contact: Sprinturf. 900 Circle 75 Parkway. Suite 1750. Atlanta, GA 30339 <br /> Contract Amount: $120,811.97 <br /> 2011 SL Marys Football Field <br /> Job Location: Shipman Road, St. Marys, OH 45885 (Take US 33 to US 66. Go north on US 66; turn <br /> right at first light (Shipman Rd). Jobsite is on Shipman Rd. <br /> Job Description: Mobilize, excavate and remove soil, install all drainage (4", 15", 12"). Install cleanouts <br /> and manhole, install 2"x4" nailer, install geotextile, provide and install stone base, seed and mulch <br /> disturbed areas. all electrical work, install track bridge, and remove and replace fence to gain access. <br /> Owner Contact: St. Marys City School District <br /> Owner Address: 100 W. Spring St., St. Marys. OH 45885 <br /> Customer Contact: ProGrass LLC; Nic Borling; 960 Penn Ave. 8th Floor, Pittsburgh, PA 15222 <br /> Engineer: MSA Sport/Kleingers <br /> Start Date: 10/03/11 <br /> Award Date: Contract Date is 09/27/11 <br /> End Date: 10/28/11 <br /> Original Contract Amount: $166,000.00 <br /> t <br /> ProGrass RFP No.12-10-03 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.