My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Medallion Athletic Products
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
Responses
>
Medallion Athletic Products
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 3:31:34 PM
Creation date
12/13/2012 3:31:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Artificial Turf for Gwen Margolis & Pelican Community Parks
Bid No. (xx-xx-xx)
12-10-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3 Staffing <br /> Medallion has a full-time staff at its Mooresville, North Carolina headquarters made up <br /> of the company owner, General Manager, and Marketing, Sales, Estimating, <br /> Operations and Accounting departments. The company also employs experienced <br /> base and drain construction and turf installation crews, each led by a crew <br /> superintendent. Medallion has a full-time professional engineer on staff who <br /> specializes in site, civil and storm water management. <br /> In addition to artificial turf, Medallion also specializes in the installation of synthetic <br /> sports surfacing (weight room flooring), athletic equipment and track surfaces. <br /> Sunny Isles Project Team <br /> The Sunny Isles project will be staffed by a project team consisting of the following <br /> Medallion personnel: <br /> • Project Manager — responsible for overall project planning and scheduling, <br /> resource coordination (material, labor and equipment), compliance with contract <br /> specifications, overall job quality and completeness, and customer interface. Will <br /> interface daily with base and turf installation superintendents to ensure <br /> appropriate construction methods are applied, monitor construction progress, <br /> and keep the customer abreast of project status. <br /> • Project Coordinator— responsible for the flow of project documents throughout <br /> the initiation and completion of the executed contract; the ordering, expediting <br /> and delivery of materials and equipment; and supporting the project manager in <br /> various stages of contract execution. <br /> • Superintendent — responsible to the project manager for providing daily work <br /> direction, monitoring completion progress and quality, and managing the field <br /> installation crew. Medallion will utilize two specialty crews (and superintendents) <br /> for this project — the first will focus on site excavation and base and drain install, <br /> the second will focus on turf install. <br /> • Installation Crew — crews of 5-8 Medallion equipment operators, general laborers <br /> and installers trained and experienced in site excavation, base and drain install, <br /> and turf install. <br /> • <br /> Medallion Athletic 4 <br /> Products, Inc. RFP No. 12-10-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.