My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins & Will
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Perkins & Will
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 4:42:57 PM
Creation date
1/9/2018 4:42:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
PROFESSIONAL ARCHITECTURAL SERVICES
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERKINS +WILL <br /> COST EFFECTIVE SOLUTIONS / <br /> 111 <br /> EXPERTS IN DELIVERING PROJECTS ON TIME AND QUALITY ASSURANCE + QUALITY CONTROL PROCESS <br /> WITHIN THE ESTABLISHED BUDGET The quality process involves the entire team. The Quality <br /> Our team has developed proven project management systems Assurance process begins with proper planning of the <br /> to ensure that your project is completed in the specified work. Every Perkins+Will project is required to undergo this <br /> timeframe and within your approved budget. We place a great process. <br /> deal of importance on establishing attainable schedule and <br /> budget goals at the beginning of the project process, and QUALITY ASSURANCE <br /> our experience enables us to anticipate any potential delays Each team member is responsible for the quality and <br /> or overruns early in the process, so that we can take action completeness of the project documents. Project document <br /> immediately and keep the project on track. reviews shall address coordination, technical content and <br /> constructability. Quality is to review for compliance with <br /> DELIVERY OF COST-CONSCIOUS DESIGN FOR project requirements, including: Scope Definition; Accuracy; <br /> TODAY+TOMORROW Clarity; Constructability; and Completeness. <br /> We have proven we can do more with less. We understand <br /> that our clients are looking for a return on their investment— Coordination is to review for compatibility and integration: <br /> both in terms of design and construction. Our work adds drawing to drawing; and specification to drawing. <br /> value beyond the cost of our services, because we carefully <br /> consider the strategies, materials and systems that achieve QUALITY CONTROL <br /> project goals at the lowest cost and best enhance our clients' The Design Team members are to complete their Quality <br /> business performance. Assurance review. As part of their review, the Quality Program <br /> Review Sign-off Log is placed on the cover or title sheet of <br /> We strive to achieve client-specific design solutions that the Quality Control Set of documents. Upon completion of <br /> deliver the highest value for each client dollar as we design the QA review the PA, PM and DD shall initial and date the <br /> for their future as well as their present. Quality Program Review Sign-off Log prior to turning the set <br /> over to the Quality Control Reviewer. <br /> The Perkins+Will team will work closely together with the <br /> entire project team including the City of Sunny Isles Project <br /> Team and other consultants and specialists to provide a <br /> high quality, high performance, value driven project within a <br /> realistic yet cost conscious budget. <br /> Through establishing appropriate monitoring and cost control <br /> reporting and processes at the beginning of the project, our <br /> project team will be in a position to prepare design solutions <br /> and proposals adhering to developed budget. Our experience <br /> in recent similar projects in Florida will assist in the <br /> maintaining project budget. The design solutions presented <br /> will be in keeping with the overall project budget. Value <br /> engineering and cost control is inherent and continuous in <br /> our team's approach. <br /> 14 Sunny Isles Government Center Lobby+Gateway Park Build-Out <br />
The URL can be used to link to this page
Your browser does not support the video tag.