My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(17-12-01) Professional Arch Srvcs Interior Remodel Govt Ctr Lobby and Gateway Park Internal Space Build
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2018 10:08:51 AM
Creation date
1/10/2018 10:08:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architecture Services
Bid No. (xx-xx-xx)
17-12-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br /> REQ 17-12-01 PROFESSIONAL ARCHITECTURAL SERVICES <br /> SPECIFIC DESIGN EXPERIENCE RELEVANT TO THE SCOPE OF WORK <br /> PROJECT APPROACHIMETHODOLOGY direction that might be developing as the project <br /> progresses. <br /> As an integral part of our approach and prior to be- • Complete and Detailed Documents: Attention <br /> ginning execution of any project, the WA team will sit will be directed to complete, coordinated con- <br /> down with key personnel from the City and discuss struction documents in order to ensure tight bids <br /> each particular project in detail. From that discussion and fewer change orders; the result will be cost <br /> we will develop a plan of action. This plan will out- control. <br /> line all sensitive issues for dialogue and develop a <br /> format for facilitating input. It will also recommend Cost estimate development and updates at the <br /> the best approach for making information available various stages will include quantification of all ma- <br /> to the public and keeping them informed. jor project elements, even at the earliest stages of <br /> plan development. Review of recent similar project <br /> Ability to Control Schedule and Budget cost history, subcontractor and supplier input at the <br /> In order to accomplish the project goals, an archi- design development stages are indispensable and <br /> tectural and engineering coordinator are strategically will be a major contributor to the accuracy of ear- <br /> placed within the organization to insure integration ly budgeting as well as a key element in assisting <br /> of all disciplines during design and construction. In with material considerations as regards to cost and <br /> addition, a quality control coordinator is positioned scheduling for that particular project. We will prepare <br /> with an independent group of in-house profession- budget estimates at several stages of document de- <br /> als to review and validate the finished product with a velopment (30%, 60%, 90% and 100%). Progress <br /> high level of technical performance. This integrated estimates are prepared from completed drawings to <br /> and proven approach to the organizational structure validate the budget or indicate if design cost exceeds <br /> offers the City a paradigm that enhances the deliv- budget parameters. <br /> ery of quality work within the proposed schedule and <br /> budget. The scope of a particular project that would be con- <br /> sidered under this RFQ, in conjunction with the cur- <br /> Cost Control Methods rent market conditions will significantly impact any <br /> Recognizing the critical importance of cost manage- estimates of actual cost and will require an under- <br /> ment when budgets are tight, WA will commence standing of, and sensitivity to, these factors. <br /> cost control procedures immediately upon issuance <br /> of the Notice to Proceed on a particular project. Schedule Control Methods <br /> WA takes pride in an outstanding record for re- <br /> The techniques to be utilized by the team for cost sponsiveness to established schedules. Particularly <br /> control include: important to this contract is our exceptional record <br /> • Program and Budget Review: A detailed review for meeting constrained schedules for contracts in- <br /> of the program and budget will be conducted to volving public facilities. In the execution of similar <br /> ensure validity and compatibility. work, the firm has always met schedule demands. <br /> • Systems Budgeting and Estimating: All budget Schedule management for this contract will be ac- <br /> estimating will be divided into subsystem corn- complished through proven project management <br /> ponents to allow for identification and control of procedures combined with a productive project team <br /> specific problem areas. and an ongoing schedule evaluation process. A for- <br /> • Cost Trending: A careful charting of the on-go- mal schedule will be developed to respond to the <br /> ing estimates will be performed to evaluate a specific needs of each task and the project manag- <br /> ARCHITECTUREGINEERING <br /> ENGINEERING <br /> . <br /> PLANNING <br /> INTERIOR DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.