My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-2002
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2020 11:31:30 AM
Creation date
1/8/2013 9:45:04 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-2002
Date (mm/dd/yyyy)
12/20/2012
Description
Award Bid 12-09-01 & Agmt w/Iron Sky for Automatic License Plate Recognition (ALPR)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Terms and Conditions <br /> • The pricing contained in this proposal is valid for a period of 90 days from the proposal date. <br /> Iron Sky can, at its discretion, provide an addendum to this document extending the proposal <br /> pricing period. <br /> • Any enhancements to, or modifications of, any software or hardware utilized in the support of <br /> the "Project" not covered in this proposal will be negotiated as a separate price. <br /> • Client will provide information and permission to connect to IT networks as necessary for <br /> installation and completion of this project. Information may include locations of network closets <br /> and utility rooms, descriptions of network infrastructure, providing static IP addresses, etc. <br /> Permission to connect may include co-location of equipment in network closets, creation of <br /> subnets or Virtual Local Area Networks (VLANs), opening certain ports on the firewall, etc. To <br /> accomplish these tasks, the Iron Sky Team would like to communicate and coordinate with the <br /> Client's IT staff early in the project planning process. Iron Sky reserves the right to delay <br /> commencement of work, at no penalty to Iron Sky, until questions have been answered, <br /> permissions have been granted, and requested information has been provided. <br /> • Client will provide static IP addresses, subnet mask, and default gateway information for all <br /> surveillance system equipment, as necessary. Client is responsible for maintaining the <br /> camera system IP address schema documentation and making updates as necessary. <br /> • Client will provide a sufficient number of network ports ("network drops") at designated <br /> telecommunications closets ("hub rooms") within the facilities and locations where surveillance <br /> system equipment will be installed. <br /> • In order to control costs, server redundancy and failover capability has not been designed into <br /> this camera system. Client understands that video is being stored only on the primary server, <br /> and failure of that server's hardware will degrade the system or cause it to stop operating. <br /> • Client is responsible for granting permission or obtaining permits to install any cameras, <br /> network equipment, mounting hardware, etc., described in this proposal. This includes <br /> permission and/or permits for installation of equipment within rooms, hallways, stairwells, and <br /> on exterior walls, on rooftops, etc., as necessary and within the scope of this proposal. <br /> • This project may contain tasks or deliverables that will depend upon client taking actions to <br /> include, but not limited to, providing information, approvals, and deliverables in order for the <br /> project to progress or be completed in a timely manner. If the project schedule is delayed in <br /> this fashion, the Iron Sky project manager will inform client and record such impact in the <br /> 1 weekly report. <br /> • Iron Sky assumes that there will be only one client Point of Contact assigned to lead this <br /> project and who will have full support from client senior management. Under this arrangement <br /> it is assumed the appropriate client personnel will be available on a timely basis to work with <br /> Iron Sky representatives, and that management will provide authority to the POC sufficient to <br /> support the full scope of the project. <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> 1 <br /> Iron Sky Response to the City of Sunny Isles Beach Request For Proposal #12-09-01 <br /> Section 4 Page 65 <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.