Laserfiche WebLink
1 <br /> Terms and Conditions <br /> • The pricing contained in this proposal is valid for a period of 90 days from the proposal date. <br /> Iron Sky can, at its discretion, provide an addendum to this document extending the proposal <br /> pricing period. <br /> • Any enhancements to, or modifications of, any software or hardware utilized in the support of <br /> the "Project" not covered in this proposal will be negotiated as a separate price. <br /> • Client will provide information and permission to connect to IT networks as necessary for <br /> installation and completion of this project. Information may include locations of network closets <br /> and utility rooms, descriptions of network infrastructure, providing static IP addresses, etc. <br /> Permission to connect may include co-location of equipment in network closets, creation of <br /> subnets or Virtual Local Area Networks (VLANs), opening certain ports on the firewall, etc. To <br /> accomplish these tasks, the Iron Sky Team would like to communicate and coordinate with the <br /> Client's IT staff early in the project planning process. Iron Sky reserves the right to delay <br /> commencement of work, at no penalty to Iron Sky, until questions have been answered, <br /> permissions have been granted, and requested information has been provided. <br /> • Client will provide static IP addresses, subnet mask, and default gateway information for all <br /> surveillance system equipment, as necessary. Client is responsible for maintaining the <br /> camera system IP address schema documentation and making updates as necessary. <br /> • Client will provide a sufficient number of network ports ("network drops") at designated <br /> telecommunications closets ("hub rooms") within the facilities and locations where surveillance <br /> system equipment will be installed. <br /> • In order to control costs, server redundancy and failover capability has not been designed into <br /> this camera system. Client understands that video is being stored only on the primary server, <br /> and failure of that server's hardware will degrade the system or cause it to stop operating. <br /> • Client is responsible for granting permission or obtaining permits to install any cameras, <br /> network equipment, mounting hardware, etc., described in this proposal. This includes <br /> permission and/or permits for installation of equipment within rooms, hallways, stairwells, and <br /> on exterior walls, on rooftops, etc., as necessary and within the scope of this proposal. <br /> • This project may contain tasks or deliverables that will depend upon client taking actions to <br /> include, but not limited to, providing information, approvals, and deliverables in order for the <br /> project to progress or be completed in a timely manner. If the project schedule is delayed in <br /> this fashion, the Iron Sky project manager will inform client and record such impact in the <br /> 1 weekly report. <br /> • Iron Sky assumes that there will be only one client Point of Contact assigned to lead this <br /> project and who will have full support from client senior management. Under this arrangement <br /> it is assumed the appropriate client personnel will be available on a timely basis to work with <br /> Iron Sky representatives, and that management will provide authority to the POC sufficient to <br /> support the full scope of the project. <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> 1 <br /> Iron Sky Response to the City of Sunny Isles Beach Request For Proposal #12-09-01 <br /> Section 4 Page 65 <br /> 1 <br /> 1 <br />