Laserfiche WebLink
FM#430029-1-32-01 <br /> Page 2 of 9 <br /> 2. The Parties.agree that the Department intends to undertake and complete the Project, which shall <br /> include improvements and rehabilitation on Bridge 874218, a bridge not on the State Highway <br /> System, which shall further include, but may not be limited to, repair of the rehabilitation of the <br /> existing bridge to restore its load carrying capacity while keeping the bridge's Historic nature, <br /> and all activities associated with, or arising out of the improvement construction and <br /> rehabilitation work (the "Local Bridge Improvements"). The CITY shall cooperate with and <br /> shall support the Department's work efforts in these regards. The Department will design and <br /> construct the Project in accordance with all applicable federal and state laws and regulations and <br /> in accordance with Department design and construction standards as set forth in the Department's <br /> guidelines, standards, and procedures. The Department shall have final decision authority with <br /> respect to the design, the design review process, and construction of the Local Bridge <br /> Improvements, and the relocation of any utilities that the Department may determine to be <br /> required. <br /> 3. The Parties acknowledge and agree that the CITY will review the Project Design Plans ("PDP") <br /> and shall submit its comments, if any, via Electronic Reviewer Comments ("ERC".) The <br /> Department shall provide the CITY access to the ERC, and the Department shall use the ERC to <br /> submit the Project Design Plans for the CITY to review. When the Department places the Project <br /> Design Plans in the ERC, the Department will designate a Comment Due Date and a Response <br /> Due Date. The CITY shall submit its comments with regards to the Project Design Plans on or <br /> before the Comment Due Date, and the Department shall respond to the CITY's comments, if <br /> any, on or before the Response Due Date. If the CITY does not submit its comments by the <br /> Comment Due Date, the CITY will be deemed to have approved the Project Design Plans <br /> submitted by the Department. The review process for the Project Design Plans will be deemed <br /> concluded when the Department has submitted the Final Project Design Plans to the ERC, and <br /> the Comment Due Date and Response Due Date for the Final Project Design Plans have passed, <br /> and the Department has addressed all of the CITY's comments that were submitted through the <br /> ERC. Once the review process is concluded,the CITY shall authorize its Public Works and Waste <br /> Management Department to issue a permit (`the Permit") to the Department's construction <br /> Contractor, authorizing the Department to construct the Project in accordance with the Final <br /> Project Design Plans submitted through ERC. The CITY acknowledges and agrees that, during <br /> construction of the Local Bridge Improvements, the Department will only utilize the services of <br /> law enforcement officers when required by the Department's Standard Specifications for Road <br />