My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2015
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 11:49:44 AM
Creation date
1/10/2013 10:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2015
Date (mm/dd/yyyy)
01/08/2013
Description
Award Bid 12-10-01/Agmt w/JVA Engineers, Pier & Restaurant Utilities
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
effective to assign to Owner, or Engineer, or any of, (whether or not specifically incorporated by <br /> their Related Entities, any duty or authority to reference in the Contract Documents);or <br /> supervise or direct the performance of the Work or <br /> any duty or authority to undertake responsibility b. the provisions of any Laws or Regulations <br /> inconsistent with the provisions of the Contract applicable to the performance of the Work <br /> Documents (unless such an interpretation of the provi- <br /> sions of the Contract Documents would <br /> 3.03 Reporting and Resolving Discrepancies result in violation of such Law or <br /> Regulation). <br /> A Reporting Discrepancies <br /> 3.04 Amending and Supplementing Contract <br /> 1 Contractor's Review of Contract Documents <br /> Documents Before Starting Work: Before <br /> undertaking each part of the Work, Contractor shall A. The Contract Documents may be <br /> carefully study and compare the Contract amended to provide for additions, deletions, and <br /> Documents and check and verify pertinent figures revisions in the Work or to modify the terms and <br /> therein and all applicable field measurements conditions thereof by either a Change Order or a <br /> Contractor shall promptly report in writing to Work Change Drective <br /> Engineer any conflict, error, ambiguity, or <br /> discrepancy which Contractor may discover and B. The requirements of the Contract <br /> shall obtain a written interpretation or clarification Documents may be supplemented, and minor <br /> from Engineer before proceeding with any Work variations and deviations in the Work may be autho- <br /> affected thereby rized, by one or more of the following ways: <br /> 2 Contractor's Review of Contract 1 A Fed Order; <br /> Documents During Performance of Work: If, during <br /> the performance of the Work. Contractor discovers 2 Engireer's approval of a Shop Drawing or <br /> any conflict, error, ambiguity, or discrepancy within Sample; (Subject to the provisions of Paragraph <br /> the Contract Documents or between the Contract 6.17.D.3),or <br /> Documents and any provision of any law or <br /> Regulation applicable to the performance of the 3 Engineer's written interpretation or <br /> Work or of any standard. specification, manual or clarification. <br /> code, or of any instruction of any Supplier.. <br /> Contractor shall promptly report it to Engineer in 3.05 Reuse of Documents <br /> writing. Contractor shall not proceed with the Work <br /> affected thereby (except in an emergency as A. Contractor and any Subcontractor or <br /> required by Paragraph 6.16.A) until an amendment Supplier or other individual or entity performing or <br /> or supplement to the Contract Documents has been furnishing all of the Work under a direct or indirect <br /> issued by one of the methods indicated in Paragraph contract with Contractor,shall not <br /> 3.04. <br /> 1. have or acquire any title to or ownership <br /> 3.Contractor shall not be liable to rights in any of the Drawings, Specifications, <br /> Owner or Engineer for failure to report any conflict, or other documents (or copies of any thereof) <br /> error, ambiguity, or discrepancy in the Contract prepared by or bearing the seal of Engineer or <br /> Documents unless Contractor knew or reasonably Engineer's consultants including electronic media <br /> should have known thereof editions;or <br /> B. Resolving Discrepancies 2. reuse any of such Drawings. <br /> Specifications other documents, or copies thereof <br /> 1 Except as may be otherwise specifically on extensions of the Project or any other project <br /> stated in the Contract Documents, the provisions of without written consent of Owner and Engineer and <br /> the Contract Documents shall take precedence in specific written verification or adaption by Engineer. <br /> resolving any conflict, error, ambiguity, or discrepan- <br /> cy between the provisions of the Contract Docu- B. The prohibition of this Paragraph 3.05 will <br /> ments and, survive final payment, or termination of the Contract <br /> Nothing herein shall preclude Contractor from <br /> a. the provisions of any standard, retaining copies of the Contract Documents for <br /> specification, manual, code, or instruction record purposes. <br /> EJCPC 0.100 Standard General Conditions of the Construction Contract, <br /> Cop?right C 2002 National Society of Professional Engineers for EJCOC. Sit rights reserved. <br /> 00704-r0 <br /> 03/12 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.