My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2015
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 11:49:44 AM
Creation date
1/10/2013 10:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2015
Date (mm/dd/yyyy)
01/08/2013
Description
Award Bid 12-10-01/Agmt w/JVA Engineers, Pier & Restaurant Utilities
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
placed, the moneys so received applied on account consent by endorsement on the policy or policies. <br /> thereof, and the Work and the cost thereof covered but the property insurance shall not be canceled or <br /> by an appropriate Change Order. permitted to lapse on account of any such partial <br /> use or occupancy. <br /> B. Owner as fiduciary shall have power to <br /> adjust and settle any loss with the insurers unless <br /> one of the parties in interest shall object in writing ARTICLE 6-CONTRACTOR S RESPONSIBILITIES <br /> within 15 days after the occurrence of loss to <br /> Owner's exercise of this power If such objection be <br /> made, Owner as fiduciary shall make settlement with 6,01 Supervision and Superintendence <br /> the insurers in accordance with such agreement as <br /> the parties in interest may reach. If no such A. Contractor shall supervise, inspect, and <br /> agreement among the parties in interest is reached, direct the Work competently and efficiently. devoting <br /> Owner as fiduciary shall adjust and settle the loss such attention thereto and applying such skills and <br /> with the insurers and if required in writing by any expertise as may be necessary to perform the Work <br /> party in interest. Owner as fiduciary shall give bond in accordance with the Contract Documents <br /> for the proper performance of such duties. Contractor shall be solely responsible for the means, <br /> methods, techniques, sequences.and procedures of <br /> 5 09 Acceptance of Bonds and Insurance. Option construction. Contractor shall not be responsible for <br /> to Replace the negligence of Owner or Engineer in the design <br /> or specification of a specific means, method, tech- <br /> A. If either Owner or Contractor has any nique, sequence,or procedure of construction which <br /> objection to the coverage afforded by or other provi- is shown or indicated in and expressly required by <br /> lions of the bonds or insurance required to be the Contract Documents. <br /> purchased and maintained by the other party in <br /> accordance with Article 5 on the basis of 8 At all times during the progress of the <br /> non-conformance with the Contract Documents, the Work, Contractor shall assign a competent resident <br /> objecting party shall so notify the other party in superintendent who shall not be replaced without <br /> writing within 10 days after receipt of the certificates written notice to Owner and Engineer except under <br /> (or other evidence requested)required by Paragraph extraordinary c4rcumstances.The superintendent will <br /> 2.01.13. Owner and Contractor shall each provide to be Contractor's representative at the Site and shall <br /> the other such additional information in respect of have authority to act on behalf of Contractor All <br /> insurance provided as the other may reasonably communications given to or received from the <br /> request. If either party does not purchase or superintendent shall be binding on Contractor. <br /> maintain all of the bonds and insurance required of <br /> such party by the Contract Documents, such party 6,02 Labor, Working Hours <br /> shall notify the other party in writing of such failure to <br /> purchase prior to the start of the Work, or of such A. Contractor shall provide competent. <br /> failure to maintain prior to any change in the suitably qualified personnel to survey and lay out the <br /> required coverage. Without prejudice to any other Work and perform construction as required by the <br /> right or remedy, the other party may elect to obtain Contract Documents. Contractor shall at all times <br /> equivalent bonds or insurance to protect such other maintain good discipline and order at the Site. <br /> party's interests at the expense of the party who was <br /> required to provide such coverage, and a Change B. Except as otherwise required for the <br /> Order shall be issued to adjust the Contract Price safety or protection of persons or the Work or <br /> accordingly. property at the Site or adjacent thereto, and except <br /> as otherwise stated in the Contract Documents, all <br /> 5.10 Partial Utilization, Acknowledgment of Work at the Site shall be performed during regular <br /> Properly Insurer working hours. Contractor will not permit the <br /> performance of Work on a Saturday,Sunday, or any <br /> A. If Owner finds it necessary to occupy or legal holiday without Owner's written consent(which <br /> use a portion or portions of the Work prior to Sub- will not be unreasonably withheld) given after prior <br /> stantial Completion of all the Work as provided in written notice to Engineer <br /> Paragraph 14.05, no such use or occupancy shall <br /> commence before the insurers providing the 6.03 Services.Materials, and Equipment <br /> property insurance pursuant to Paragraph 5.06 have <br /> acknowledged notice thereof and in writing effected A. Unless otherwise specified in the <br /> any changes in coverage necessitated thereby. The Contract Documents, Contractor shall provide and <br /> insurers providing the property insurance shall assume full responsibility for all services, materials <br /> HOW C 700 Standard General(ouiJutruos of the CoostrucfionContract. <br /> Copyright C 2on2!Sad anal Society of Professional Engineers for EJCOC. Ali rights resered. <br /> 00700.18 <br /> 03112 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.