My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Cummins Cederberg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 9:57:53 AM
Creation date
3/23/2018 9:52:14 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Cummins | Cederberg <br />7550 Red Road, Suite 217 ▪ Miami, Florida 33143 <br />Phone: +1 305 741 6155 ▪ Fax: +1 305 974 1969 <br />info@CumminsCederberg.com ▪ www.CumminsCederberg.com <br />CUMMINS | CEDERBERG <br />Coastal & Marine Engineering <br />Approach and Methodology <br /> <br />Cummins Cederberg understands servicing the City of Sunny Isles Beach (City), means ultimately servicing <br />the public including residents and many visitors. Cummins Cederberg has always promoted clear <br />communication and practical solutions allowing our Clients to make informed decisions, which are <br />functional and within budget requirements. In order to ensure a high quality and successful delivery of <br />requested services for the City, Cummins Cederberg will assign our experienced President, Mr. Jannek <br />Cederberg, P.E., as Project Manager for the service agreement. Cummins Cederberg is accustomed to <br />working in Sunny Isles Beach and understands the uniqueness of the City, as well as the challenges arising <br />from a low lying island with many residents and visitors. We have successfully worked through these <br />challenges before in Sunny Isles Beach, as well as Miami-Dade County (County) in general, and are <br />confident we can continue, while establishing a long term relationship as a trusted advisor. <br /> <br />Most coastal and marine related projects include several phases of work through the duration of the project <br />as illustrated in the below flow chart. The following is a brief description of the typical components required <br />for a successful project, from initial conception through implementation. Included are examples from recent <br />projects by our firm to illustrate relevant experience. The scope and extent required within each component <br />will vary amongst projects. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.