Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE 13. ROLE IN THIS CONTRACT12. NAME <br />15. FIRM NAME AND LOCATION (City and State) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />(2) YEAR COMPLETED <br />. <br />(2) YEAR COMPLETED <br />. <br />(2) YEAR COMPLETED <br />(2) YEAR COMPLETED <br />. <br />Jannek Cederberg Senior Coastal & Marine Engineer <br />a. TOTAL <br />17 <br />b. WITH CURRENT FIRM <br />8 <br />Cummins Cederberg, Inc. South Miami, Florida <br />M. Sc., Coastal Engineering Professional Engineer, Florida <br /> <br /> CONSTRUCTION (If applicable)PROFESSIONAL SERVICES <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Environmental permitting for reconstruction of a 30-slip marina in Biscayne Bay through local, state, and <br />federal agencies (DERM, FDEP, and USACE). Engineering support through construction bid process, including <br />bid evaluation and selection. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br /> <br /> (1) TITLE AND LOCATION (City and State) <br />CONSTRUCTION (If applicable)PROFESSIONAL SERVICES <br /> <br /> <br /> <br /> <br /> CONSTRUCTION (If applicable)PROFESSIONAL SERVICES <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> (1) TITLE AND LOCATION (City and State) <br /> <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br />(1) TITLE AND LOCATION (City and State) <br />Costa Brava Marina, Miami Beach <br />North District Wastewater Treatment Plant <br />Assessment of coastal resiliency of important infrastructure components relative to flooding and <br />sea level rise. Analyzed storm surge impacts from historical hurricane events as well assessed <br />potential and magnitude of future impacts. Evaluated risk and probability of various events. <br />Village of Key Biscayne Beach Nourishment, Key Biscayne <br />Winston Tower 700, Sunny Isles Beach <br />Construction of 240 feet of seawall and repair of 800 feet of seawall for shoreline stabilization at <br />large condominium. Above/below water condition inspection, seawall replacement and repair design, <br />permit application and processing (DERM/USACE/DEP), construction administration. <br />Matheson Hammock Sea Level Rise Flood Mitigation Study, <br />Miami <br />ts <br />ing <br />ted <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Technical assessment of the conditions at Matheson Hammock Park relative to developing flood mitigation concep to <br />limit impacts of sea level rise. compiling and processing of topographic LiDAR data to develop a detailed <br />topographic map. Conditions inspection of all significant infrastructure components. Mapping of environmental <br />resources. Typical and extreme tidal water levels was evaluated to understand peak tidal levels and exceedance <br />probability. Published sea level rise projections were reviewed and adopted for the study. A flood inundation <br />model was developed to analyze areas of flooding and timeframes relative to sea level rise. Flood mitigation <br />concepts were developed and evaluated relative to urgency, construction costs, impacts to Park guests, permit <br />feasibility and environmental impacts. An implementation schedule reaching the year 2100 was developed, outlin <br />estimated infrastructure replacement dates, anticipated service life and required elevations based on the adop <br />sea level rise projection. <br />STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />2014 2014 <br />2015 <br />2003 2003 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal engineering and environmental permitting for 120,000 cy beach fill and dune restoration <br />project. Beach profile and hydrographic surveys conducted, along with sand source search, jet <br />probes, vibracores, and sediment compatibility analysis. Coordination of dune vegetation planting <br />and exotic removal plan. <br />2016 2016 <br />N/A