Laserfiche WebLink
Florida Keys Aqueduct Authority, Monroe County, Florida - Numerous <br />Projects 1995 - ongoing ongoing <br />Florida Key Aqueduct Authority Mr. Ray Shimokubo/Mr. Tom Walker, P.E. 305-296-2454 <br />Nutting has been providing geotechnical engineering and <br />construction materials testing services to the Florida Keys <br />Aqueduct Authority for over 20 years. <br />Projects include: <br /> Distribution Pump Station <br />Directional Drilling @ 18 Mile Stretch <br />Cross Key Pump Station Tower <br />Key Largo Maintenance Building <br />Ocean Reef Distribution System Improvements - <br />Phase II <br />Main R.O. Warehouse <br />Rockland Key Property (Site I & II) <br />North Crawl Key <br />Ocean Reef Vacuum/Pump Station <br />Key Largo Pump Station <br />Key Largo WWTP <br />Duck Key Waste Water and Water Line <br />Conch Key WWTP <br />Layton Key Waste Water and Water Line <br />Installations <br />Distribution System Upgrades along US-1 <br />Islamorada Pump Station <br />Projects via consultants include: <br />FKAA J. Robert Dean Water Treatment Plant, <br />Florida City <br />FKAA - Eden Pines and Pine Channel Estates, Big <br />Pine Key <br />FKAA Outer Islands, Big Pine Key, Ramrod Key, <br />Little Torch Key, Lower Sugarloaf Key <br />FKAA - Cudjoe Key Waste Water Collection <br />System, Lower Sugar Loaf Pump Station <br />FKAA-Key Haven Utility Improvements <br />FKAA Force Main, Boca Chica <br />FKAA Building, 615 33rd Gulf, Marathon <br />Nutting Engineers of Florida, Inc. Miami, Florida Geotechnical Engineering Firm- full <br />scope of services <br />3 <br />20. EXAMPLE PROJECTF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S KEY NUMBERQUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 PAGE 5(REV. 3/2013) <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE