My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Calvin Giordano
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:51:34 AM
Creation date
3/23/2018 10:01:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STANDARD FORM 330 (REV. 312013) PAGE 1 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />2 <br />21. TITLE AND LOCATION (City and State) <br />Shoreline Stabilization/Wave Break Hugh Taylor Birch State Park <br />Fort Lauderdale, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Marine Environmental <br />Science <br />CONSTRUCTION (If Applicable) <br />N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER Florida Park Service, FDEP <br />Via a Coastal Engineering and Marine <br />Environmental Services Contract with <br />Humiston & Moore Engineers, PA <br />b. POINT OF CONTACT NAME <br /> Theresa Carron, FDEP <br />Brett D. Moore, Humiston & Moore <br />c. POINT OF CONTACT TELEPHONE NUMBER FDEP - 850-245-3029 <br />Humiston & Moore - 239-594-2021 <br />24. BRIEF DESCRIPTION OF PROJECT RELEVANCE TO THIS CONTACT (Include scope, size and cost) <br /> <br />• Budget: $34,000 / Final Cost: $34,000 <br />• Original Schedule: September 2016 <br />• Actual Schedule: September 2016 <br /> <br />Project Description: Pinnacle Ecological, Inc. (Pinnacle) was contracted by Florida Department of Environmental <br />Protection (FDEP) through a continuing Coastal Engineering and Marine Environmental Services Contract with Humiston <br />& Moore Engineers, PA to provide environmental science and project management services associated with a shoreline <br />stabilization and wave break project at Hugh Taylor Birch State Park (Park) in Broward County, Florida. The Park is <br />positioned on a barrier island (created after construction of the Intracoastal Waterway (ICWW)) that borders the Atlantic <br />Ocean. Pinnacle performed a comprehensive benthic assessment study to delineate and quantify seagrass resources <br />occurring in vicinity of the proposed project area. Pinnacle’s team of scientific divers surveyed a total of 33,612 meters2 <br />(8.3 acres) of seafloor immediately adjacent to the concrete bulkhead that borders the Park’s west boundary along the <br />ICWW. The objective of the assessment survey was to identify, delineate and map marine benthic resources in vicinity of <br />the proposed project area which could be impacted by construction related activities. The initial seagrass assessment and <br />mapping survey was conducted from 15 to 26 June 2015. Seagrass habitat was m apped using qualitative data from belt <br />transects. A total of 238 transects varying from 30 to 100 feet were surveyed by Pinnacle’s scientific dive team. <br />Macroalgae and paddle grass (Halophila decipiens) represented the dominant biota observed during the seagrass <br />assessment survey. Paddle grass (H. decipiens) was the only seagrass species observed in the survey area. The total <br />seagrass habitat delineated and mapped during the seagrass assessment study was 21,473 meters 2 (5.3 acres). The <br />average seagrass density in the area ranged between 25 and 50% cover. The seagrass assessment survey report was <br />submitted 22 July 2015. Additional field efforts occurred on 17, 18, and 20 February 2016 to map concrete pile debris in <br />the area to determine an approximate area of coverage and identify select areas for targeting debris removal to facilitate <br />mitigation. The results of the seagrass assessment survey were used to complete a Florida Unified Mitigation <br />Assessment Methodology (UMAM) Forms Part 1 (Qualitative Description) and Part 2 (Quantitative Description), and <br />develop a Seagrass Mitigation Plan. The Mitigation Plan provides a summary of the proposed mitigation activities, <br />monitoring plan, success criteria and deliverables necessary to mitigate potential impacts associa ted with project related <br />activities. Following extensive engagement with State and Federal Government Agencies, the Mitigation Plan was <br />prepared in accordance with the recommendations presented by the National Marine Fisheries Service (NMFS) on 14 <br />October 2015 and was submitted 10 August 2016. Pinnacle also completed NMFS Endangered Species Act Section 7 <br />Checklist, on 26 May 2016, and supported NMFS staff during the Biological Opinion consultation as a part of the <br />permitting process for the proposed construction activities. Additionally, Pinnacle developed a Seagrass Monitoring Plan. <br />The monitoring plan was submitted 30 June 2016, and describes monitoring activities intended to measure the physical <br />and biological environmental conditions occurring within sea grass habitat and mitigation areas situated between the <br />ICWW and the bulkhead bordering the Park’s western boundary. The monitoring plan includes pre - and post-construction <br />surveys in mitigation areas and non-mitigation areas and an additional 3 years of annual monitoring to determine whether <br />the planned seagrass mitigation is meeting the designed success criteria. <br /> <br /> <br />111
The URL can be used to link to this page
Your browser does not support the video tag.