My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Calvin Giordano
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:51:34 AM
Creation date
3/23/2018 10:01:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />4 <br />21. TITLE AND LOCATION (City and State) <br />SINGER ISLAND DUNE RESTORATION 2017 <br />SINGER ISLAND, FLORIDA <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Eastman Aggregates <br />b. POINT OF CONTACT NAME <br />Mr. Bernie Eastman <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(561) 969-7147 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />The project consisted of the restoration of beach shoreline on Singer Island. Approximately <br />50,000 cubic yards of sand were trucked in and placed on the shoreline. <br /> <br />GFA Contract <br />• $2,320.50 <br /> <br />GFA Services <br />GFA provided geotechnical engineering services which consisted of engineering technicians <br />to perform mobile laboratory testing (sieve analysis, was 230, construction observation), as <br />well as vibration monitoring. <br /> <br />GFA Service Summary <br />• Geotechnical Engineering <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />GFA Project #: 10-1549.01 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />GFA International, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />Delray Beach, FL <br /> <br />(3) ROLE <br /> <br />Geotechnical Engineering <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> STANDARD FORM 330 (1/2004) PAGE 3 <br /> 133
The URL can be used to link to this page
Your browser does not support the video tag.