|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12 NAME
<br />Mohamed Mabrouk, P.E.
<br />13 ROLE IN THIS CONTRACT
<br />Senior Project Engineer 14. YEARS EXPERIENCE a TOTAL
<br />12
<br />b WITH CURRENT FIRM
<br />3 15 FIRM NAME AND LOCATION (City and State)
<br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA 16 EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science in Civil Engineering, FIU Masters of Science in Civil Engineering, FIU Masters of Science in Engineering Management, FIU
<br />17 CURRENT PROFESSIONAL REGISTRATION
<br />(STATE AND DISCIPLINE)
<br />PE FLORIDA NO. 74614 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />TIN#M162554834530 CTQP: QC Manager; Advanced MOT; Asphalt 1 & 2; Earthwork 1 & 2 (pending); Final
<br />Estimates 1 & 2; FDOT LAP Checklist Training
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />FDOT District 6; NW 57th Avenue Roadway Improvements
<br />Grouping; Miami, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Assistant Resident Engineer. The contract included roadway widening, culvert installation, major utility work,
<br />drainage improvements, signalization improvements, signing, pavement marking, and milling & resurfacing.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Pompano Beach; MLK (Hammondville Road)
<br />Improvements (from Powerline Road to Turnpike) Project
<br />FM # 432861-1-58-01; Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. Improvements include roadway widening, sidewalk installation, drainage
<br />improvements, milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and
<br />pavement markings. Cost $3,554,121.43
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Oakland Park; Bid Pack 9 Infrastructure
<br />Improvements; Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. The project encompasses approximately 570 acres, the project boundaries are east of
<br />Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project
<br />includes drainage improvement, water main replacement, sewer force main replacement, rehabilitation of Lift
<br />Station B-2, Lift Station #3, Lift Station #4, sidewalk installation, roadway improvements and resurfacing. Cost
<br />$9,640,779.41
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Department of Environmental Protection; Kemp Channel
<br />Span Replacement; Project FM # 418396-1, FDEP Project #
<br />FS050; Kemp Channel, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. Construction of the Kemp Channel Bridge Span replacement and retrofitting, located at
<br />approximately Mile Marker 23.5. This project is to be a portion of the Florida Keys Overseas Heritage Trail State
<br />Park as described in the approved Trail Master Plan dated August 2000. Cost $1,868,000.00
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Oakland Park; Bid Pack 9 Infrastructure
<br />Improvements; Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. The project encompasses approximately 570 acres, the project boundaries are east of
<br />Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project
<br />includes drainage improvement, water main replacement, sewer force main replacement, rehabilitation of Lift
<br />Station B-2, Lift Station #3, Lift Station #4, sidewalk installation, roadway improvements and resurfacing. Cost
<br />$9,640,779.41
<br />
<br />61
|