Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12 NAME <br />Mohamed Mabrouk, P.E. <br />13 ROLE IN THIS CONTRACT <br />Senior Project Engineer 14. YEARS EXPERIENCE a TOTAL <br />12 <br />b WITH CURRENT FIRM <br />3 15 FIRM NAME AND LOCATION (City and State) <br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA 16 EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science in Civil Engineering, FIU Masters of Science in Civil Engineering, FIU Masters of Science in Engineering Management, FIU <br />17 CURRENT PROFESSIONAL REGISTRATION <br />(STATE AND DISCIPLINE) <br />PE FLORIDA NO. 74614 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />TIN#M162554834530 CTQP: QC Manager; Advanced MOT; Asphalt 1 & 2; Earthwork 1 & 2 (pending); Final <br />Estimates 1 & 2; FDOT LAP Checklist Training <br /> 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT District 6; NW 57th Avenue Roadway Improvements <br />Grouping; Miami, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Assistant Resident Engineer. The contract included roadway widening, culvert installation, major utility work, <br />drainage improvements, signalization improvements, signing, pavement marking, and milling & resurfacing. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />City of Pompano Beach; MLK (Hammondville Road) <br />Improvements (from Powerline Road to Turnpike) Project <br />FM # 432861-1-58-01; Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. Improvements include roadway widening, sidewalk installation, drainage <br />improvements, milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and <br />pavement markings. Cost $3,554,121.43 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />City of Oakland Park; Bid Pack 9 Infrastructure <br />Improvements; Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. The project encompasses approximately 570 acres, the project boundaries are east of <br />Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project <br />includes drainage improvement, water main replacement, sewer force main replacement, rehabilitation of Lift <br />Station B-2, Lift Station #3, Lift Station #4, sidewalk installation, roadway improvements and resurfacing. Cost <br />$9,640,779.41 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Department of Environmental Protection; Kemp Channel <br />Span Replacement; Project FM # 418396-1, FDEP Project # <br />FS050; Kemp Channel, Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. Construction of the Kemp Channel Bridge Span replacement and retrofitting, located at <br />approximately Mile Marker 23.5. This project is to be a portion of the Florida Keys Overseas Heritage Trail State <br />Park as described in the approved Trail Master Plan dated August 2000. Cost $1,868,000.00 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of Oakland Park; Bid Pack 9 Infrastructure <br />Improvements; Florida <br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. The project encompasses approximately 570 acres, the project boundaries are east of <br />Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project <br />includes drainage improvement, water main replacement, sewer force main replacement, rehabilitation of Lift <br />Station B-2, Lift Station #3, Lift Station #4, sidewalk installation, roadway improvements and resurfacing. Cost <br />$9,640,779.41 <br /> <br />61