<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />
<br />
<br />12. NAME
<br />Brett D. Moore, P.E., D.CE.
<br />13. ROLE IN THIS CONTRACT
<br />Project Manager / Principal Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />37
<br />b. WITH CURRENT FIRM
<br />26
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Humiston & Moore Engineers, Naples FL
<br />16. EDUCATION (Degree and Specialization)
<br />M.C.E., Coastal Engineering, University of Delaware 1982 B.C.E., Civil
<br />Engineering, University of Delaware, 1979
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br />Registered Professional Engineer, State of Florida
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />ASCE FL Engineering Society
<br />FL Shore and Beach Preservation Association
<br />2013 FSBPA Jim Purpura/T.Y. Chiu Engineering Award
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Honeymoon Island Erosion Control Project Phase II
<br />Pinellas County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer and Project Manager; for the design, permitting, bid documents, technical specifications and construction management of
<br />the second phase of an erosion control project involving the placement of 3 erosion control structures and 163,000 cy of beach fill. Project
<br />includes sand source evaluation for both upland sand sources and nearshore ebb shoal region. Project was completed in October 2015 and is
<br />currently in second year of a 5-year monitoring period.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Doctors Pass Erosion Control Project
<br />Naples, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014-present
<br />CONSTRUCTION (If Applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer and Project Manager for the design, permitting, bid document preparation, and construction management of the
<br />reconstruction of a jetty and construction of a breakwater and detached groin system downdrift of jettied inlet. This beach segment was the
<br />highest eroding section in Collier County and beach fill alone was not sustainable. Project design considered 4-yr sand bypass from inlet
<br />maintenance dredging. Construction completion scheduled from April 2018.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />South Siesta Key Beach Restoration Project
<br />Sarasota, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012-2016
<br />CONSTRUCTION (If Applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer and Project Manager for the design, permitting, bid document preparation, and construction management of the first
<br />renourishment of the 2.1-mile section of beach at South Siesta Key. The project included an offshore sand search and the inclusion of an
<br />innovative submerged berm segment to improve the longevity of the beach fill at the south end which has experienced chronic erosion. The
<br />project was built in 2016 and is currently being monitored.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Apollo Beach Nature Preserve Shoreline Restoration
<br />Hillsborough County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013-present
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer and Project Manager for the design, permitting, technical specification preparation, and construction management of the
<br />shoreline stabilization and restoration of the Apollo Beach Nature Preserve Park shoreline in Hillsborough County. The park property had
<br />been eroding since the mid 1990’s and an existing revetment was failing. The project included 7 breakwaters and 1 T-groin, revetment
<br />redesign, seagrass mitigation, and local stakeholder coordination on dredging and beach restoration. Currently developing operations plan
<br />with the County.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Keewaydin Island Erosion Control Project
<br />Naples, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2000-present
<br />CONSTRUCTION (If Applicable)
<br />2003 & 2012
<br />
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager; for the design and permitting and construction management of a two-phased erosion control project downdrift of the
<br />Gordon Pass Federal Navigation Channel at Gordon Pass. Phase One involved jetty tightening and construction of three T-groins (2003).
<br />Phase Two consisted of two breakwaters with detached low profile groins. Project designed to work with 6-year interval of maintenance
<br />dredging of Gordon Pass. The project is currently being monitored.