My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-02) Parks and Recreational Facilities Landscape Maintenance Services
>
ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 9:56:03 AM
Creation date
3/30/2018 9:51:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach | ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services 95 <br />186 J10 Skilled Sawman Hourly <br />Labor <br />Rate $ $ <br />187 J11 <br />Loading and Hauling Debris from Public <br />Property and Rights-of-Way (vegetative or <br />construction debris) to a Temporary Debris <br />Staging and Reduction Site per Cubic Yard <br />within City Limits <br />(Estimated 5,000 cubic yards) <br />Per Cubic <br />Yard <br />$ $ <br />188 <br />J12 <br />Loading and Hauling Debris from Public <br />Property and Rights-of-Way (vegetative or <br />construction debris) to a Final Disposal Site <br />per Cubic Yard within 25 miles of City limits <br />(Estimated 5,000 cubic yards) <br />Per Cubic <br />Yard <br />$ $ <br />189 <br />J13 <br />Loading and Hauling Debris from Public <br />Property and Rights-of-Way (vegetative or <br />construction debris) to a Final Disposal Site <br />per Cubic Yard in excess of 25 miles <br />(Estimated 5,000 cubic yards) <br />Per Cubic <br />Yard $ $ <br />190 J14 Debris Reduction by Chipping/Grinding Per <br />Cubic Yard <br />per Cubic <br />Yard $ <br />$ <br />$ <br />$ <br />191 J15 <br />Removal of Hazardous Trees and Limbs <br />Work consists of removing and placing them <br />at a City approved location on the City ROW. <br />6 inch to 23.99 inch diameter <br />Each <br />$ $ <br />192 J15 <br />(A) <br />Continued… <br />24 inch to 35.99 inch diameter Each <br />$ $ <br />193 J15 <br />(B) <br />Continued… <br />36 inch and larger diameter Each <br />$ $ <br />194 <br />J16 <br />Removal of Hazardous Stumps Rate includes <br />removal, backfill of stump hole, reduction, <br />and final disposal. Sizes as follows: 24.1 inch <br />to 36.99 inch diameter <br />Each $ $ <br />195 <br />J16A 37 inch to 48.99 inch diameter Each $ $
The URL can be used to link to this page
Your browser does not support the video tag.