My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 10:12:54 AM
Creation date
3/30/2018 10:02:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 46 <br /> <br />Contractor shall submit a monthly wet-check report, or more frequently as required by the City, <br />at its sole discretion, to ensure the proper coverage is being achieved, and utilize this wet-check <br />report for proposals for repairs. In addition to wet checks, the Contractor shall provide meter <br />readings to verify viability of systems at least once per month, or more frequently as required by <br />the City, at its sole discretion. <br /> <br />3.7.1 IRRIGATION GENERAL CONDITIONS <br /> <br />All irrigation lines are to be flushed, cleaned, and maintained monthly, or as required to <br />maintain the required water flow. This shall include, but not be limited to, the adjustment of <br />the flow of water of irrigation heads so as to minimize or eliminate t he flow of water onto the <br />public roadway, sidewalk and buildings, and the checking of breaks, and replacement of broken <br />or stolen heads. All valves, controllers, and other components must be maintained on a regular <br />basis at no additional charge. This will include, but not be limited to, the adjustments of the <br />controllers to ensure the correct amount of precipitation necessary for viable vegetative <br />growth, always following any South Florida Water Management District drought guidelines. The <br />Contractor shall check for breaks in the lateral lines. All irrigation breaks or malfunctions must <br />be repaired by the Contractor within twenty-four (24) hours notification by City (including <br />weekends). This includes all vehicular damage to irrigation and/or landscape mat erials. <br />Furthermore, all damages noticed by Contractor shall be reported to City Project Manager(s) <br />within twenty-four (24) hours. <br /> <br />Irrigation repairs and maintenance shall not be sub -contracted. Contractor shall have sufficient <br />labor, materials, tools, equipment, and qualified and certified supervision to adequately <br />maintain irrigation systems to the City’s specifications and be approved by the City. <br /> <br />3.7.2 COLLINS AVENUE MEDIAN <br /> <br />The Collins Avenue median is irrigated through a ‘wethose’ subsurface irrigation system <br />supplied by City water meters, with the exception of median island ‘bullnoses’ which are <br />watered with overhead irrigation. <br /> <br />3.7.3 ON-GOING MAINTENANCE <br /> <br />Required on-going maintenance as follows: <br /> <br />Weekly: Contractor is to visually inspect all irrigated areas once per week to identify <br />potential leaks as evidenced by water related plant stress, surface water, <br />dry spots, correct spray patterns, prevention of overspray on pavement, <br />head clogging and retracting, broken or damaged equipment, and paved <br />surfaces and walls affected by irrigation spray. <br /> <br />Monthly: Turn system on with controllers and check program. Adjust program as <br />needed for seasons, new plantings, and weather conditions. Verify that <br />system is running 20 minutes on and 20 minutes off, per cycle, to prevent <br />‘wethose’ hydration (decrease leak rate). Suggested frequency of
The URL can be used to link to this page
Your browser does not support the video tag.