My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 10:12:54 AM
Creation date
3/30/2018 10:02:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 71 <br /> <br />responsible for immediately notifying the City of any graffiti found during the <br />regular servicing and inspection of the City. This shall include the removal of the <br />graffiti along the barrier walls of the William Lehman Causeway and Sunny Isles <br />Boulevard. <br /> <br />L6 BEE, WASP AND HORNET REMOVAL <br /> <br />Proper removal and eradication of bee, wasp and hornet nests by a registered <br />beekeeper or trained Pest Control Operator. <br /> <br />L7 PREVENTIVE MOSQUITO CONTROL WITHIN CITY RIGHTS-OF-WAY <br /> <br />This bid item includes fogging seven miles of City rights-of-way and the Public <br />Works compound under the William Lehman Causeway. Fogging to be <br />performed with truck mounted fogger. Work to be completed overnight in the <br />pre-dawn hours (exact times to be determined by City) in a manner safe to the <br />public. Avoid spraying when residents are active. <br /> <br />L8 PREVENTIVE MOSQUITO CONTROL WITHIN CATCH BASINS AND RETENTION <br />AREAS <br /> <br />This bid item includes installing Altosid Briquets, or approved equal, in catch <br />basins and retention areas throughout the City. <br /> <br />L9 DATE PALM FUNGICIDE TRUNK DRENCH <br /> <br />This bid item includes a top to bottom fungicide trunk drench utilizing T-Storm or <br />Cleary’s 3336 in the event that Thielvopsis paradoxa is identified in close <br />proximity to subject palms. <br /> <br />L10 DEEPROOT ROOT BARRIER <br />Model #UB 24-2 <br />This Bid item is to include the supplying, delivery and placement of DeepRoot <br />Root barrier (or approved equal) in the locations designated by the City. <br /> <br /> L11-L26 MISCELLANEOUS ITEMS CONTINUED <br /> <br /> (*Please note, the following line items pertain to disaster debris hauling, which will only <br /> be activated upon a notice to proceed after a declared emergency, these line items <br /> intentionally include ROW and Parks as part of the scope ) <br /> <br /> <br />5.1.6.1 EMERGENCY PUSH/ROAD CLEARANCE <br />At the request of the City for this contract, work shall consist of all labor, equipment, fuel and <br />associated costs necessary to clear and remove debris from City roadways, to make them passable
The URL can be used to link to this page
Your browser does not support the video tag.