My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 10:12:54 AM
Creation date
3/30/2018 10:02:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 77 <br /> <br />Manager shall assist, as directed by the City, in responding to Federal and State agency requests <br />for additional information and in negotiations with Federal and State offi cials. Project Manager shall <br />retain all documentation and records for a minimum of ten (10) years. <br /> <br />L12 TREE CLIMBER/ CHAINSAW AND GEAR <br />Contractor shall trim, cut and/or fell leaning trees and/or hanging limbs only upon prior written <br />consent of the Contract Manager. Each tree and limb shall then be placed in the public right -of- <br />way where such debris shall be removed and included in the overall cubic yard price for debris <br />removal. A fallen tree that extends onto the public right -of-way from private property shall be cut <br />at the point where it enters the right-of-way, and that part of the debris which lies within the right- <br />of-way shall be removed. <br /> <br />L13 LABORER W/SMALL TOOLS, TRAFFIC CONTROL OR FLAG PERSON <br /> <br />The Contractor(s) shall mitigate the impact of their operations on local traffic to the fullest extent <br />practical. The Contractor(s) is responsible for establishing and maintaining appropriate traffic <br />controls in all work areas, including DMS(s) and debris collection sites. The Contractor(s) shall <br />provide sufficient signing, flagging and barricading to ensure the safety of vehicular and pedestrian <br />traffic in all work areas. All work shall be done in conformity with all applicable local, state and <br />federal laws, regulations, and ordinances governing personnel, e quipment and work place safety. <br />Any notification of a deficiency in traffic control or other safety items shall be immediately <br />corrected by the Contractor(s). <br /> <br />L14 SKILLED SAWMAN <br /> <br />The Contractor will be responsible for the handling, reduction and final haul-out and disposal of all <br />reduced and unreduced debris. Contractor operations and remediation must comply with all local, <br />state and federal safety and environmental standards. Contractor reduction, handling, disposal and <br />remediation methods must be approved, in writing, by the City Debris Manager. <br /> <br />L15 LOADING AND HAULING DEBRIS FROM PUBLIC PROPERTY AND RIGHTS-OF-WAY <br />TO A TEMPORARY DEBRIS STAGING AND REDUCTION SITE WITHIN CITY LIMITS <br /> <br />Immediately following a disaster, it may be necessary for Contractor t o cut, toss and/or push <br />debris from primary transportation routes as identified and directed by the City. This hourly work <br />will only be conducted for the first seventy (70) hours only unless otherwise agreed in writing. <br />Debris Removal from Public Rights-of-Way – As identified and directed by the City, contractor <br />shall provide all labor, services, equipment, materials, and supplies necessary to collect Vegetative <br />Debris and Mixed Debris from the City rights-of-way and public property. Contractor shall provide <br />debris collection in a systematic manner according to Work Zones in accordance with advanced <br />written authorization from the Contract Manager. Contractor shall haul all debris to designated <br />temporary staging areas, disposal sites, or recycling centers , as determined by the Contract <br />Manager. DMC shall have TDMSs ready to open and receive debris within twenty-four (24) to thirty- <br />six (36) hours of notification by the Contract Manager. TDMSs will be activated on an “as needed”
The URL can be used to link to this page
Your browser does not support the video tag.