My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 10:12:54 AM
Creation date
3/30/2018 10:02:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 93 <br /> <br />I. MATERIALS <br />147 <br />I1 Coconut Palm OTC Injection <br />596 <br />Application <br /> <br /> <br />$ <br /> <br /> <br />$ <br />148 <br />I2 Date Palm OTC Injection <br />395 <br />Application <br /> <br /> <br />$ <br /> <br /> <br />$ <br />149 <br />I3 Topsoil (70/30 Mix) <br />Delivered and Installed <br />200 <br />Cu. Yd. $ <br />$ <br />150 <br />I4 Premium Gold Mulch <br />Delivered and Installed <br />1,500 <br />Cu. Yd. <br /> <br />$ <br /> <br /> <br />$ <br />151 <br />I5 Premium Gold Mulch <br />Delivered and Installed <br />100 <br />Bags <br />(2 cu. ft.) <br />$ <br /> <br /> <br />$ <br />152 <br />I6 #70 Trap Sand <br />Delivered and Installed <br />700 <br />Cu. Yd. <br /> <br />$ <br /> <br /> <br />$ <br />153 <br />I7 Atlas 3000 (or equal) Mix <br />Delivered and Installed <br />100 <br />Cu. Yd. <br /> <br />$ <br /> <br /> <br />$ <br />154 <br />I8 Solid St. Augustine ‘Floratam’ Sod <br />Delivered and Installed <br />2500 <br />Sq. Ft. <br /> <br />$ <br /> <br /> <br />$ <br />155 <br />I9 Solid St. Augustine ‘Floratam’ Sod <br />Delivered and Installed <br />60 pallets <br />(500 SF <br />Each) <br /> <br />$ <br /> <br /> <br />$ <br />156 <br />I10 Solid Bermuda ‘Tifway 419’ Turf <br />Delivered and Installed <br />5 pallets <br />(400 SF <br />Each) <br /> <br />$ <br /> <br /> <br />$ <br />157 <br />I11 Solid Paspalum notatum ‘Argentine’ Bahia Sod <br />Delivered and Installed <br />5 pallets <br />(400 SF <br />Each) <br /> <br />$ <br /> <br /> <br />$ <br />158 <br />I12 Palm Beach Cap Rock 4 Sq. Ft. <br /> <br />$ <br /> <br /> <br />$ <br />Subtotal Section “I” Lines No. 147 – 158: <br /> <br />$ <br /> <br />J. LABOR <br />159 <br />J1 One Landscape Superintendent <br />100 Hours <br />(8am – <br />5pm, M-F) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$
The URL can be used to link to this page
Your browser does not support the video tag.