My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 10:12:54 AM
Creation date
3/30/2018 10:02:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 97 <br /> <br />196 <br />L17 <br />Loading and Hauling Debris from Public <br />Property and Rights-of-Way (vegetative or <br />construction debris) to a Final Disposal Site <br />per Cubic Yard in excess of 25 miles <br />(Estimated 5,000 cubic yards) <br /> <br />Per Cubic <br />Yard $ <br /> <br /> <br />$ <br /> <br />197 L18 <br /> <br />Debris Reduction by Chipping/Grinding per <br />Cubic Yard <br /> <br />per Cubic <br />Yard <br /> <br /> <br />$ <br /> <br />$ <br /> <br /> <br /> <br />$ <br /> <br />$ <br /> <br /> <br /> <br />198 L19 <br />Removal of Hazardous Trees and Limbs <br />Work consists of removing and placing them <br />at a City approved location on the City ROW. <br />6 inch to 23.99 inch diameter <br />Each <br /> <br /> <br /> <br /> <br />$ <br /> <br /> <br /> <br /> <br /> <br />$ <br /> 199 L19 <br />(A) <br />Continued… <br />24 inch to 35.99 inch diameter Each <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br /> <br />200 <br />L19 <br />(B) <br /> <br />Continued… <br />36 inch and larger diameter Each <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br /> 201 <br />L20 <br />Removal of Hazardous Stumps Rate includes <br />removal, backfill of stump hole, reduction, <br />and final disposal. Sizes as follows: 24.1 inch <br />to 36.99 inch diameter <br />Each <br />$ <br /> <br /> <br />$ <br />202 L20 <br />(A) 37 inch to 48.99 inch diameter Each $ <br /> <br />$ <br />203 L20 <br />(B) 49 inch and larger diameter Each $ <br /> <br />$ <br />204 <br />L21 Generator, 500 KW, List kW Capacity <br />(Daily Rate) <br />Hourly <br />Labor Rate <br /> <br /> <br />$ <br /> <br /> <br />$ <br />205 <br />L22 Wheel Loader, 3 CY, 152 HP <br />(Including Operator) (Daily Rate) <br />Hourly <br />Labor Rate <br /> <br /> <br />$ <br /> <br /> <br />$ <br />206 <br />L23 <br />Dozer, Tracked, D4 or Equivalent <br />(Including Operator) <br />(Daily Rate) <br />Hourly <br />Labor Rate <br /> <br /> <br />$ <br /> <br /> <br />$ <br />207 <br />L24 <br />Tub Grinder 800 to 1,000 HP <br />(Including Operator) <br />(Hourly Rate) <br />(Hourly Rate) <br />Hourly <br />Labor Rate <br /> <br /> <br />$ <br /> <br /> <br />$
The URL can be used to link to this page
Your browser does not support the video tag.