Laserfiche WebLink
- CITY,OF SUNNY ISLES BEACH . <br /> 18070.Collins Avenue '. <br /> Sunny Isles Beach, Florida.33160 ,0""'`tiF <br /> 305.947.0606 ,o` -- - --s;0 <br /> ._. _ t 042-•'-:`,I; <br /> vmwaibll.net <br /> o <br /> FC?ror sii1 P14 <br /> 196 Loading and Hauling Debris from Public <br /> Property and Rights-of-Way (vegetative or <br /> L17 construction debris) to a Final Disposal Site Per Cubic $ <br /> per Cubic Yard in excess of 25 miles Yard $ 27.50 27.50 <br /> (Estimated 5,000 cubic yards) <br /> 197 L18 Debris Reduction by Chipping/Grinding per per Cubic <br /> Cubic Yard Yard $ 30 $ 30 <br /> Removal of Hazardous Trees and Limbs <br /> 198 Work consists of removing and placing them <br /> L19 at a City approved location on the City ROW. Each <br /> 6 inch to 23.99 inch diameter $ 1300 $ 1300 <br /> 199 <br /> L19 Continued... Each <br /> (A) . - � 24 inch to 35.99 inch diameter ".2000 2000 <br /> 200 (g) ContinuedL19 I <br /> ... Each <br /> 36 inch and larger diameter $ 2500 $ 2500 <br /> 201 Removal of Hazardous Stumps Rate includes <br /> removal, backfill of stump hole, reduction, <br /> L20 and final disposal. Sizes as follows: 24.1 inch Each $ 500 $ 500 <br /> to 36.99 inch diameter <br /> 202 <br /> A) 37 inch to 48.99 inch diameter Each $ 650 $ 650 <br /> 203 <br /> L20 49 inch and larger diameter Each $ $ 1000 <br /> • <br /> (B) ' 1000 ' <br /> 204 <br /> L21Generator, 500 KW, List kW Capacity Hourly 50 <br /> (Daily Rate) Labor Rate $ $ 400 <br /> 205 Wheel Loader, 3 CY, 152 HP Hourly <br /> L22 (Including Operator) (Daily Rate) Labor Rate 155 155 <br /> 206 Dozer, Tracked, D4 or Equivalent Hourly <br /> L23 (Including Operator) <br /> (Daily Rate) Labor Rate 270 270 <br /> 207 Tub Grinder 800 to 1,000 HP <br /> L24 (Including Operator) Hourly <br /> Labor Rate <br /> (Hourly Rate) $ 1000 $ 1000 <br /> City of Sunny Isles Beach I ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 97 <br />