Laserfiche WebLink
•�fa ��.+,ate,"£ $• �.> a _ - �.'?y 1 y,{ �L ctE ,5t^:s 45: - 'm e i.tea. r. `.e +- ! ¢.�'�gS s_3"S :; .t:. '%t y 3 t ,7A`✓=.L' .�L <"?£:y.>d, <br /> �3. c \za .� x�,Ms , sad i <br /> ma `1 �C '+...?s .�° - ��_:. � �q��a• �.�� �i3�c ti��� i `J,.-c4J�i.`�S` '>•..a-cc �'SSh�„.r:..& <br /> �Xa`t <br /> �t,�a 1.'5 � ;3? r s .4 a? L ?✓:ai�� J �=8 a �'e`j ofl^�l 1VI �Sat .,' 4s, <br /> ��fCY�'V'4 � ' <br /> :�:R b ''� .Y'�t�ZF d i 4'� O�}"3' 4 +�y�'1xfJ`"i{ e'� !.\ �•C� � <br /> :17�"-t'•��4.;%,l `Za " ?fitessfw • <br /> '2,S x• <br /> .; v '�Sa 2. .� �\?�3\ 0 <br /> :-ark - -- "-.\�,f ♦�i{ �Z 1 a�'�M�far• <br /> x',t-. ':S�e�''Rx-, <br /> • <br /> 3F 1-fioa' 4 <br /> 0 <br /> ?Y or sLN P� <br /> • The year and month, if available, that the information was compiled and the name, <br /> address, and emergency telephone number of the manufacturer responsible for preparing <br /> the information. <br /> 2.30 PROTECTION OF PROPERTY, UTILITIES, AND THE PUBLIC <br /> The Contractor must continuously maintain adequate protection of all its Work from all losses or <br /> damage and must protect public and private property, and utilities from injury or loss arising in <br /> connection with the Work, and take all necessary precautions to prevent accidents, injuries, or <br /> damage to persons or property on or near the Work. <br /> The Contractor is solely responsible for,and must replace and make good all loss,injury,or damage <br /> to any property including, but not limited to, landscaping, irrigation, walks, drives, structures, or <br /> utilities resulting from performance of the Work. <br /> 2.31 CONTRACTOR'S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE <br /> Where the Contractor's operations could cause damage or inconvenience to telephone, fiber optic, <br /> television, electrical power, oil, gas, water, sewer, or irrigation systems, the Contractor must make <br /> all arrangements necessary for the protection of these utilities and services or any other known <br /> utilities. <br /> Notify all utility companies that are affected by the construction operation at least forty-eight(48) <br /> hours in advance. Under no circumstance expose any utility without first obtaining permission from <br /> the appropriate agency. Once permission has been granted, locate,expose,and provide temporary <br /> support for all existing underground utilities and utility poles where necessary. <br /> The Contractor and its Subcontractors will be solely and directly responsible to the owner and <br /> operators of such properties for any damage, injury, expense, loss, inconvenience, delay, suits, <br /> actions, or claims of any character brought because of any injuries or damage which may result <br /> from the construction operations under the Contract Documents. <br /> Neither the City nor its officers or agents will be responsible to the Contractor for damages as a <br /> result of the Contractor's failure to protect property encountered in the Work. <br /> In the event of interruption to domestic water, sewer, storm drain, or other utility services as a <br /> result of accidental breakage due to construction operations, Contractor must promptly notify the <br /> owner, any required regulatory authority, and the Project Manager(s). Contractor shall also <br /> cooperate with said authority in restoration of service as promptly as possible and bear all costs of <br /> repair and any required interim measures to ensure safety. In no event will interruption of any <br /> utility service be allowed unless granted by the owner of the utility. <br /> In the event water service lines that interfere with trenching are encountered, the Contractor may, <br /> by obtaining prior approval of the water utility, cut the service, dig through, and restore the service <br /> with similar and equal materials at the Contractor's expense and as approved by the Project <br /> Manager(s). <br /> City of Sunny Isles Beach I ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 32 <br /> Lukes' Landscaping, Inc. <br />