Laserfiche WebLink
❑ Retain schematic drawings and other documents in the "job file" for use in developing future <br />plans. <br />Component Parts of a Temporary Traffic Control Zone <br />21 <br />A. <br />t* <br />1 <br />Termination Area <br />lets traffic resume <br />30m (100 ft) Downstream Taper normal operations <br />Traffic Space <br />allows traffic <br />Ih <br />Work Space <br />to pass through <br />is set aside for <br />the activity area <br />workers, equipment, <br />and material storage <br />Activity Area <br />is where work <br />Buffer Space <br />'� takes place <br />(lateral) <br />7--0- <br />Buffer Space <br />provides <br />(longitudinal) <br />protection for <br />provides protection for <br />traffic and <br />traffic and workers <br />workers <br />; <br />4 <br />Transition Area <br />;i <br />moves traffic out <br />Er <br />of its normal path <br />i Fry <br />iY. <br />1� <br />i <br />Advance Warning Area <br />tells traffic what to <br />expect ahead <br />.L <br />4 1 <br />.L <br />Legend <br />-► Direction of <br />travel <br />21 <br />