Laserfiche WebLink
❑ Retain schematic drawings and other documents in the "job file" for use in developing future <br />plans. <br />Component Parts of a Temporary Traffic Control Zone <br />iA <br />�r <br />.f. <br />Termination Area <br />� <br />lets traffic resume <br />30m (100 ft) Downstream Taper normal operations <br />r i <br />Traffic Space; <br />allows traffic <br />n i in'k <br />Work Space <br />to pass through <br />is set aside for <br />the activity area <br />I f " <br />workers, equipment, <br />and material storage <br />i <br />Activity Area <br />`g <br />is where work <br />Buffer Space <br />E I' <br />takes place <br />(lateral) <br />K-!, <br />Buffer Space <br />provides <br />f, <br />I <br />` <br />(longitudinal) <br />protection for <br />< j <br />provides protection for <br />traffic and <br />�n .�! <br />traffic and workers <br />workers <br />r <br />( <br />Transition Area <br />moves traffic out <br />of Its normal path <br />F <br />F � � <br />�f <br />y <br />k � 1 <br />"i <br />.L <br />Advance Warning Area <br />tells traffic what to <br />expeclahead <br />.6. <br />1 I I <br />.i. <br />Legend <br />—+ Direction of <br />travel <br />iA <br />