Laserfiche WebLink
`'�r of sura hN - <br />161 <br />50 Hours <br />H6 <br />One Irrigation Specialist <br />(All other <br />times) <br />$ 52.00 <br />$ 2,600.00 <br />162 <br />75 Hours <br />H7 <br />One Irrigation Laborer <br />(8am — <br />5pm, M -F) <br />$ 23.00 <br />$1,725.00 <br />163 <br />50 Hours <br />H8 <br />One Irrigation Laborer <br />(All other <br />times) <br />$ 30.00 <br />$1,500.00 <br />Subtotal Section "H" Lines No. 156 —163: <br />$ 20,950.00 <br />I. EQUIPMENT <br />164 <br />11 <br />One Front End Loader with Backhoe, <br />5 Hours <br />including an Operator (Hourly Rate) <br />55.00 <br />275.00 <br />165 <br />I2 <br />One Front End Loader with Backhoe, <br />5 Days <br />including an Operator (Daily Rate) <br />450.00 <br />$2,250.00 <br />166 <br />I3 <br />One 15,000 GVW (or larger) Dump Truck <br />5 Hours <br />$ 225.00 <br />with an Operator (Hourly Rate) <br />$ 45.00 <br />167 <br />14 <br />One 15,000 GVW (or larger) Dump Truck <br />5 Day s <br />with an Operator (Daily Rate) <br />400.00 <br />2,000.00 <br />168 <br />One Trailer Mounted Water Tank (500 gallon <br />I5 <br />minimum) with Pump and Hose Reel <br />5 Days <br />220.00 <br />(Daily Rate) <br />1,100.00 <br />169 <br />I6 <br />One Self Propelled 24" Deep by 6" Wide <br />5 Hours <br />Trencher with an Operator (Hourly Rate) <br />70.00 <br />350.00 <br />170 <br />I7 <br />One Self Propelled 24" Deep by 6" Wide <br />5 Days <br />320.00 <br />Trencher with an Operator (Daily Rate) <br />1,600.00 <br />171 <br />I8 <br />Bucket Truck (equipment only) <br />20 Hours <br />(Hourly Rate) <br />50.00 <br />1,000.00 <br />172 <br />I9 <br />Chipper Brush (equipment only) <br />20 Hours <br />(Hourly Rate) <br />22.00 <br />440.00 <br />City of Sunny Isles Beach I ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services <br />