My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lukes Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-02) Parks and Recreational Facilities Landscape Maintenance Services
>
Responses
>
Lukes Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 12:19:53 PM
Creation date
4/26/2018 11:32:39 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks and Recreational Facilities Landscape Maintenance Serv
Bid No. (xx-xx-xx)
18-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISASTER RECOVERY SERVICES: <br />City of Aventura: Hurricane Irma <br />.i. Cooreinatee with City officials -First Push - <br />2. Cleared internal roadway, of debris and relucated to holding site. <br />,j. Cleared internal roadways under direction of EmcrrcnLy manasement 3ervicuz <br />concentrating an main through fain. <br />zi. Usee muitiple pieces of machinerp, 5rapplc truck3, dump truck,, 3kid3teer, backhoe, <br />front loader combinations, Etc. <br />�. Rept all irrigation backflows in off position until further c„aluetion, sur dernagE rapair <br />could bE assc»ed. <br />S. /►ssistee public works with placement of orrcw bunrd3, traffic cune3, and berricade3 to <br />cordon off debri, from public access. <br />i. Mlet wh:R City Landscape Architect to detcrminu viability of fallen trec-3, hanging limbi, <br />and any unsafe conditions that we would encuumer. <br />a. Continuing lanascape ishrubs, trees, palm! r.3turatiun. <br />City of Sunny I,Ic3: Hurricane Irma <br />1. Coordinated with City officials "First Push" <br />L. Cleared Collins Ave of dcbri3 and rclLcatcd to huldins Site. <br />3. Cleared internal roadways ander direction of Emergency management services <br />concentratin5 on main thrUC;bh fail=. <br />4. Used maltipic pieces of machinery_ grapple tracks_ dump tracks_ skidsteer, backhoe. <br />Tront loader combination=, ctc. <br />5. Kept all irrigation backflows in off position until further evaluations for damage repair <br />could be assessed. <br />6. A„fisted public wurks with placement uf arrow boards, traffic cones, and barricades to <br />cordon off debris from public acczj3. <br />7. Met with City Landscape Architect to determine viability of fallen trees. hanging limbs. <br />ane any unsafe conditions that w- wL;.ld-nczamtur. <br />8. Cuntinuing landscape (Arabs, trees_ palm) resturadOn. <br />Town of Safside: Rurricane Irma <br />1. Coordinated with City ufficial3 "Fir3t Push -- <br />2. Cleared internal roadways of debris and relocated to holding site. <br />3. Cleared internal ruadway3 under dimctiun of Emer6Cncy management Services <br />concentrating on main through fairs. <br />4. Used multiple picca3 of machinery, 5rapple truck=, dump truck3, Skidstaer, backhoe, <br />front leader combinaduns etc. <br />LuK7vS' Lanihen-j ing; Inc. <br />7/'r <br />
The URL can be used to link to this page
Your browser does not support the video tag.