Laserfiche WebLink
`71'V or .5uN r - <br />or tRe Environmental Protection Agency CEPA) at 40 CFR part 247 that contain the highest percentage of <br />recovered materials practicable, consistent with maintaining a satisfactory level of compeddon, where <br />the purchase price of the item exceeds 510,000 or the value of the quantity acquired during the preceding <br />fiscal year exceeded $i0,000; procuring solid waste management services in a manner that maximizes <br />energy ansa resource recovery; and estaGlisMing an arnrmadve procurement program ror procurement OT <br />rcca crea rm .tcri.15 iaerltincd iR tRe EPA saiaelinc.. <br />(78 FR 78608, Dec. 26, 20 3, as amended at 79 FR /J885, Oec. L7, cvi41 <br />WO.jt3 CoritriXt cost orla pricc. <br />(a) The non -Federal entity must perform a cost ar price analysis in connection with every procurement <br />action in excess of the simplified Acquisition i Rresnolla including contram moaiiications. i Re metnod ana <br />degree or analysis is dependent on the facts surrounding Me particular procurement sita..tion, But ..3 <br />3ta1'ting point, tRe non-Fcacral cntity rna3t rnoRe ii-Mepen$ei-it estimates before receivinb bids or <br />proposals. <br />(13) 1 Me non -Federal entity must negotiate profit as a separate eiement or the price for eacR contract in <br />wMicR mere is no price competition and in all cases wRere cost analysis is perror... ca. iv czEmBli,R a Tair <br />Qrld rca om.15iG profit, con,ioeration rrlust be given to tRe complexity of the work to be performed, the <br />risk borne by the contractor, the contractor's investment, the amount of subcontracting, the quality of its <br />record of past performance, and industry profit rates in the surrounding geographical area for similar <br />work. <br />jc) Co3t3 or prices na3.151 vn c3tiRlotea costs for contracts under Me Federal award are allowable only to <br />the extent that costs incurred or cost estimates included in negotiated prices would be allowable for the <br />non -Federal entity under Subpart E—CoSt Principles of this pay L. The non -Federal entity may reference its <br />own cant principles that comply with the Federal cost principles. <br />id) i Mc ev.-t plate o percentage or cost and percentage of construction cost methods of contracting must <br />not be used. <br />WMaczi Federal awarding agency or pass-tRrougA entity review. <br />(a) The non -Federal entity must make available, upon request of the Federal awarding agency or pass- <br />through entity, technical specifications on proposed procurements where the Federal awarding agency or <br />pass-through entity believes such review is needed to ensure that the item or service specified is Elle one <br />oeing proposed ror acquisition. i Ris review generauy will take place prior to the time tRe specification is <br />incorporated into a solicii..iiarl aocamci-,t. Flv c cr, if tnc mvm-Fcacral c�.tity 8esires to Rage tRe review <br />City of sunny Isles Reach 1111 La -0.3-0c ParRs and Recreadonai Facilities Eandscape Maintenance zoervices <br />Lukes' Lana ocapi g, Inc. <br />