My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 02762 - 15 <br />TELEVISING STORM SEWER SYSTEMS <br /> <br /> <br /> <br />3.6 PHOTOGRAPHS <br /> <br />During CCTV inspections, screen captures will be taken from the monitor images and <br />saved electronically by the in-sewer inspection crew of typical conditions every 200-feet <br />and at all defects, construction features, manholes and laterals. The screen capture shall <br />have the pipe reach (identified by the upstream and downstream manholes), survey <br />direction, footage, and date when photograph was taken. The annotation shall be clearly <br />visible and in contrast to its background, shall have a figure size no greater than 1/4-inch, <br />and shall be type-printed. The annotation shall be positioned on the front of the <br />photograph so as to not interfere with the subject of the photograph. Photograph files <br />shall be named by the video capture system and automatically referenced to the logged <br />defect. <br /> <br />The image of the sewer shall fill the photographic image. Photographs must clearly and <br />accurately show what is displayed on the monitor, which shall be in proper adjustment. <br />Where significant features exist within 6-feet of each other, 1 photograph shall be made <br />to record these features. Where there is a continuous feature, photographs shall not be <br />taken at intervals of less than 6- feet unless absolutely necessary to show a change in <br />the feature. <br /> <br />The images shall be kept electronically, copied to a hard drive, and submitted with the <br />inspection videos, database and reports. <br /> <br />3.7 MANHOLE NUMBERING, INSPECTION FORMS AND DEFECT CODES <br /> <br />A. The Contractor will be required to use the manhole numbering as shown on <br />sewer maps provided by the Owner when performing the inspections for this <br />project. <br /> <br />B. The Owner inspection forms and standard defect codes shall be used. The defect <br />codes, inspection forms, inspection database and inspection protocols shall be in <br />accordance with the National Association of Sewer Service Companies <br />(NASSCO) Pipeline Assessment and Certification Program (PACP) and Manhole <br />Assessment and Certification Program (MACP). <br /> <br />C. When lateral inspections are performed as part of the main sewer inspection, <br />lateral numbers shall be referenced in the "comment" field of the main sewer <br />PACP report. The lateral number shall be as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.