My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. North Bay Road Drainage Improvements 18-04-01 18 <br /> <br />In the event that material is suspected by the City of being reused or not new in original packaging, <br />the material may be rejected. The Contractor shall remove such material and replace it at his/her <br />cost and within the original schedule. No provisions or allotments for delays or time extensions to <br />the schedule as a result of “defective”, unacceptable material, or reused material found shall be <br />granted. <br /> <br />2.26 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A NOTICE TO PROCEED <br />The Contractor shall neither commence any work, nor enter a City work premise, until a written <br />Notice to Proceed (NTP) directing the Contractor to proceed with the work has been received by <br />the Contractor from the City Manager; provided however, that such notification shall be superseded <br />by any emergency work that may be required in accordance with provisions included elsewhere in <br />this solicitation and resultant contract. In addition to the written NTP, the Contractor must supply <br />the City with the required insurance and bond documents. <br /> <br />2.27 ACCIDENT PREVENTION AND BARRICADES <br />Barricades, cones, construction fencing, temporary construction fencing and off duty police officers, <br />per City regulations and other relevant requirements, shall be provided by the Contractor when <br />work is performed in areas traversed by persons, vehicular traffic or when deemed necessary by <br />the City Manager at no extra cost to the City. CONTINUOUS OFF-DUTY POLICE SUPPORT SHALL <br />BE REQUIRED FOR ALL WORK RESULTING IN MODIFICATIONS TO THE EXISTING TRAFFIC FLOW <br />PATTERNS INCLUDING BUT NOT LIMITED TO LANE CLOSURES AND DETOURS OR WHERE <br />OTHERWISE REQUESTED BY THE CITY. <br /> <br />Contractor shall comply with City, State and Federal regulations and permit requirements for the <br />placement of the proper Traffic Control Devices. Precautions shall be exercised at all times for the <br />protection of persons and property. All services performed under this contract shall conform to all <br />relevant regulations as prescribed in the current edition of the Manual of Uniform Traffic Control <br />Devices (MUTCD), the Florida Department of Transportation’s Design Standards (DS) and OSHA <br />during the course of such effort. Where requirements vary or conflict, the more stringent shall <br />apply. Any fines levied by the above mentioned authorities for failure to comply with these <br />requirements shall be borne solely by the Contractor. <br /> <br />2.28 SAFETY MEASURES: <br /> <br /> Contractor shall take all necessary precautions for the safety of employees, and shall erect <br /> and properly maintain at all times all necessary safeguards for the protection of the <br /> employees and the public. Contractor to follow all OSHA Safety Standards. Danger signs warning <br /> against hazards created by his/ her operation and work in progress must be posted. <br /> <br /> All employees of the contractor shall be expected to wear safety glasses o r goggles, <br /> appropriate clothing, and hearing protection when and wherever applicable. The contractor shall <br /> use only equipment that is fully operational and in safe operating order. Contractor shall be <br /> especially careful when servicing property when pedestrians and/ or vehicles are in close proximity <br /> — work shall cease until it is safe to proceed. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.